Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....
PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...

All ideas

Showing 5966

Edit meter reading value before Sync

Would be good if the data sent to MXAPIASSETMETER (meter reading), to be able to have their values edited before synchronization with the IBM MAXIMO, if the device is still offline. So, non-synchronized values should be discarded when a new readin...
over 1 year ago in IBM MAS - Mobile 1 Not under consideration

Enable Link Labels to be (1) imported, (2) exported, and (3) available to display in a JRS report (see ENGRPT-I-40).

Link Labels are not fully implemented. They exist in the database and can be edited via the DNG web app, but they cannot be (1) imported, (2) exported, or (3) displayed on a JRS report (see ENGRPT-I-40). Consequently, I can only enter/edit the lab...
4 months ago in IBM Engineering - Requirements Management DOORS Next / Feature 0 Future consideration

Need more flexibility for scheduling and updating PMs (job plans and schedules) that share the same job plan.

We need to be able to have multiple assets under one job plan with different schedules/frequencies. Today, we cannot do this - all assets must follow the same schedule. To get around this, we create a separate job plan for every asset - approx. 12...
4 months ago in IBM TRIRIGA Operations & Maintenance Management 1 Future consideration

[IDz/Pending Changes] Add Change Summary/Open in Change Explorer/ Associate Work Item / Remove Work Item in the Change set right click menu

In comparison between IDz client and EWM client for Visual Studio, we find out that some good functions of Visual Studio are not available in IDz client. They are the functions when we right click on the change set in Pending Changes view. These f...
4 months ago in IBM Engineering - Workflow Management / Source Control 2 Planned for future release

Add version change to the Pending Changes and History view

In the Pending Changes view, when the incoming change set appears, we don't know exactly the change of the version. It can be confused to developers. We propose to add the information of version modification to the Pending Changes and History, so ...
4 months ago in IBM Engineering - Workflow Management / Source Control 3 Not under consideration

Ability to configure Inspection Forms at Site level as well as at Org Level (Similar to Job Plan)

As we are aware that Inspection forms by design are intended to work in an ORG level only. We have a business requirement to be able to configure at Site level as well as Org level, in line with Job Plan functionality.
over 2 years ago in IBM MAS - Manage (Base) / Asset/Work Management 0 Future consideration

Need to add description to the desktop requisition when materail is requested on the mobile application

When approving a desktop requisition the user needs to see the description to know what they are approving.
about 2 months ago in IBM MAS - Mobile 0 Under review

Birt report (SVG export) as Additional Application Designer component

As a system administrator I would like to include a Birt Report output (without navigation, only the report output) in the UI as an SVG/PNG graphic Such that I can include charts and dynamic graphics in the UI There are various needs to add a grap...
about 2 months ago in IBM MAS - Manage (Base) / Reporting 0 Future consideration

Iframe (Embedded website/dashboard) as Additional Application Designer component

As a system administrator I want to embed an iframe in a tab-section or dialog-section Such that I can show related systems without leaving my Maximo instance From a technology perspective I'm proposing an iframe UI component in the application de...
about 2 months ago in IBM MAS - Manage (Base) / System Admin Config/Security 2 Planned for future release

Fix the timeout observed when filter applied with link type

Problem: When a view contains a Link Exists filter with additional filters for linked artifacts, processing such a view may take a lot of time and may result in timeout. This is a known limitation in 7.0.2 version - IBM Engineering Lifecycle Manag...
about 2 months ago in IBM Engineering - Requirements Management DOORS Next / Performance 0 Future consideration