Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....
PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...

All ideas

Showing 2805

Safety roll down from Parent to child locations

Safety like Hazards/Precautions roll down from Parent Location to child location would be very useful. It would be good to have ‘Safety Roll Down’ to child Locations from Parent Locations. Provides a flexible option for business to roll down the ‘...
over 1 year ago in IBM MAS - Manage (Base) / Asset/Work Management 1 Future consideration

Show the full path of 'Planned for'

Today, when I list the field 'Planned for' in a query the return is only the name/description. I would like a way to list the full path of this field. I also tryed to get the full path using the Report Builder but without succes. I noticed that in...
over 2 years ago in IBM Engineering - Workflow Management / Work Items 2 Future consideration

Enhancement request for Hide flow property in Direction Flows

We are using direction flows in internal block diagrams. In feature or product specific diagrams we are using the same blocks and interface blocks and we don't need all flow properties from interface block to be present in the direction flow. Need...
over 1 year ago in IBM Engineering - Systems Design Rhapsody/RMM / Modeling and UI 1 Future consideration

Start Constraint Offset (PM / JOBPLAN.STCONOFFSET) and Finish Constraint Offset (PM / JOBPLAN.FNCONOFFSET) propagation to the Tasks

Attributes Start Constraint Offset (PM / JOBPLAN.STCONOFFSET) and Finish Constraint Offset (PM / JOBPLAN.FNCONOFFSET) are available in PM and JobPlan which when applied to the work order with target dates calculate a ‘Start No Earlier Than’ and’ F...
almost 3 years ago in IBM MAS - Scheduler 3 Future consideration

Undeliver last Change Set

Undelivering Changesets not possible in Doors Next, only Discard before Delivering possible. Use Case1: A user is making some changes and delivers the CS. After the CS delivery, the user realizes that the changes done are incorrect/ unwanted. The ...
over 1 year ago in IBM Engineering - Requirements Management DOORS Next / Feature 0 Future consideration

Mouse hover feature to preview document

Support comment: The mouse hover feature did used to work fine in the past for the EWM application (early 6.0.x releases) however, our team felt it was a security issue to have the preview shown for files such as PDFs, Excel and Word docs and as s...
almost 4 years ago in IBM Engineering - Workflow Management / Usability 1 Future consideration

Meteogram type charts with multiple bars/lines

More flexibility functionality in the weather charts. Not just bar charts, but line graphs with multiple variables plotted. This functionality WAS in the old IOS version of the operations dashboard, and allows a quick view of the weather forecast,...
almost 3 years ago in Environmental Intelligence Suite: Foundation / Dashboard Visualizations 3 Future consideration

Support of ASD format in Maximo Integration Framework

ASD exchange format is a standard in Europe for exchanging informations between companies in Aerospace and Defense sector. It's requested by our customers (Thales ...), prospects (Safran, Armies ...) as they must use this standard to exchange info...
over 1 year ago in IBM MAS - Aviation 2 Future consideration

Enhance Inspection form conditional UI to calculate using more than 1 input fields ( at least 2 input ).

Maximo inspections forms has feature to make a field readonly or hide based on input from 1 of the field. Requesting to enhance this feature to calculate based on atleast 2 input fields. There are a number of scenarios where inputs form 2 fields c...
over 1 year ago in IBM MAS - Mobile 1 Future consideration

Warranty Claims Processing Needs Flexibility and Enhancements

In the Transportation Industry, warranty claims can generate a significant portion of operational cost coverage from Manufacturers. Annually this can total upwards of $5 to $10 million and thus it is important that the contracts with these Manufac...
over 2 years ago in IBM MAS - Transportation 2 Future consideration