Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....
PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...

All ideas

Showing 5832

Utilize historyflag field on Inspection Results for COMPLETED & CAN Statuses

We added a historyflag field to inspectionresult but it is only used with a special ARCHIVED status that is only available in the UI (it's not used to set the actual status). Users are likely to only put it in a COMPLETED or CAN status. To optimiz...
over 1 year ago in IBM MAS - Mobile 1 Not under consideration

All email link need to redirect to GC contexte rather than local stream

All email send by QM (and I guess RM, but our today issue is related to QM) need consistency in link used. Exemple : After declaring a Formal review , user receive an email ("New Review")=> this first email link to a GC stream Next, user receiv...
4 months ago in IBM Engineering - Test Management / Email Notification 0 Future consideration

Allow selecting all dependencies to be ignored

Current behavior: When a user accepts a Change Set from other stream, a list of dependent CS is provided. The user can select which CS to ignore, one by one. This action is very time consuming, if there are many dependencies and the user wants to ...
about 1 year ago in IBM Engineering - Requirements Management DOORS Next / Usability 0 Future consideration

Dynamically adjust the Columns in the Application list tab

Users are requesting to change the columns according to their need in the application list tab. we are having the security restriction to hide and show, but it is not full filling the users need.
over 2 years ago in IBM MAS - Manage (Base) / Asset/Work Management 1 Not under consideration

Need to limit import of soft deleted object from DOORS in ReqIf

DOORS -> DOORS Next ReqIf migration Soft deleted object are transferred in DOORS Next, and marked with ReqIF.ForeignDeleted. If User in DOORS Next delete those entry and then re-import the ReqIf those artifact are "resurrected". The original in...
6 months ago in IBM Engineering - Requirements Management DOORS Next / Feature 0 Future consideration

Need to limit export of soft deleted object in ReqIf

DOORS -> DOORS Next ReqIf migration Soft deleted object are transferred in DOORS Next, and marked with ReqIF.ForeignDeleted. If User in DOORS Next delete those entry and then re-import the ReqIf those artifact are "resurrected". The original in...

Provide attachment anti-virus scanning functionality for non-IBM SaaS implementations

IBM have implemented functionality that allows Maximo to pass attachments to a 3rd party server for scanning for viruses. This functionality is controlled via the mxe.doclink.isVirusScanEnabled system property. This request is for the functionalit...
about 8 years ago in IBM MAS - Manage (Base) 2 Future consideration

Accept Changes : Ignore All Option in Accepting Changes instead of Selecting One by One

Hi, During Accept Changes Process, specific change-sets need to be selected rest of them needs to be marked as Ignored for dependent change-sets. From a User Perspective, they want Ignore all button to Ignore all dependent change-sets
8 months ago in IBM Engineering - Requirements Management DOORS Next / Feature 0 Future consideration

Enhance multiproject and team management

We developing electronic control units, the developement for those is usually seperated in multiple domains. Those domains move with different velocities and not all are organiazed in the ALM envoironment. Production and logistics for example have...
2 months ago in IBM Engineering - Workflow Management / Planning 1 Future consideration

Combining Market-Based emissions data into the Monthly Data Summary report

Add Market-Based Emissions data into the Monthly Data Summary, instead of being a seperate PowerReport. At the moment we need to download both reports and create our own PowerBI dashboard outside of Envizi to be able to display both market-based a...
2 months ago in IBM Envizi - ESG Suite / Scope 1&2 GHG Accounting & Reporting 1 Future consideration