Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

IBM Engineering - Workflow Management

Showing 530

Download all attachments of a work item by one click

Currently it is possible to print a work item in PDF. But some work items have attachments specified in the workflow but we cannot extract all the attachments quickly. It would be useful to have a button to extract all attachments in a zip file.
over 2 years ago in IBM Engineering - Workflow Management / Work Items 1 Future consideration

preserve the EWM/RTC check in Date/Timestamp

Case number TS016744050 Is a way to preserve the EWM/RTC check in Date/Timestamp when pulling the files from EWM/RTC using the Jenkins Source Pull Pipeline that loads the files into the CICD Build workspace prior to executing build scripts? Curren...
4 months ago in IBM Engineering - Workflow Management / Source Control 1 Not under consideration

Modernize External Attachment Capability Since MS has Discontinued Support on WebDav Protocol

EWM (CCM) Advanced Properties has settings to store attachments on another server or attached drive. There needs to be another way to implement storing attachments on another server other than using Microsoft's WebDave protocol, which is now disco...
4 months ago in IBM Engineering - Workflow Management / Work Items 3 Not under consideration

Unable to filter Code Review issues by "Resolution“ and "Type“

IBM documentation states [1] that "For example, you can filter issues based on the type of issues that are raised (Type), or how an issue was resolved (Resolution)." However that is not possible and APAR ID - PH56447 was raised [2]. In view above ...
over 1 year ago in IBM Engineering - Workflow Management / Work Items 1 Future consideration

make EWM server installable from a RPM

In order to install an EWM server on Red Hat Enterprise Linux (among others) we need a RPM. So it would be useful for IBM to provide one or more RPMs on jazz.net in order to install an EWM server and its optional components : CCM, JTS, DCC, etc. T...
almost 3 years ago in IBM Engineering - Workflow Management / Installation 1 Not under consideration

Add variable in work item template

In 7.0.2 EWM it's possible to create workitens using work item template. Today I can include two variables before creating the workitens (Filed Against and Planned For). The request here is to include as a third variable the Parent Link.
8 months ago in IBM Engineering - Workflow Management / Work Items 1 Future consideration

Migrated work items code review status is not detected by the default query procedure

Migrated work item code review status is not detected by the default query procedure. Consequently work item code review status reporting is currently inaccurate. Once this idea is implemented, it will aid with accurate reporting to meet code revi...
over 1 year ago in IBM Engineering - Workflow Management / Reporting 1 Future consideration

Change "Last Updated" not for changes of Copyright Statement

The "Last Updated" in the Documentation should show when the content was updated. If the Copyright Statement is changed for a new Release, all Documentation pages get actually a new "Last Updated" Date.
4 months ago in IBM Engineering - Workflow Management / Documentation 1 Not under consideration

These "System Attributes" supporting the Code Review should be created automatically when an EWM project is enabled with code review

Design Issue: These "System Attributes" supporting the Code Review. Why should a Customer create these Attributes to be able to use the Feature? The Attributes should be created using activating an option introduced by an iFix etc. The customer mu...
over 1 year ago in IBM Engineering - Workflow Management / Source Control 1 Future consideration

load rules filtering by component property

We need to be able to load Jazz SCM components based on the value of a custom property on those components.Currently with a loadrules file, we can specify which components and which paths to load, but only statically. We want to be able to determi...
over 3 years ago in IBM Engineering - Workflow Management / Source Control 2 Future consideration