Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....
PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...

All ideas

Showing 5831

Code review workflow must be consistent across code review cycles.

Currently the Code Review cycles are not consistent. The 1st Code Review cycle and subsequent Code Review cycles steps are ambiguous, the IBM documentation is also inaccurate as per skills Case xx4370. End users have to log into multiple interface...
about 1 year ago in IBM Engineering - Workflow Management / Source Control 1 Future consideration

Allow Group data lockdown

Hi Envizi Team, Understood that there is a lock down function in Envizi: https://knowledgebase.envizi.com/home/locking-down-data However, this is not very useful when it comes to reporting because we perform assurance in phases and we would like t...
over 1 year ago in IBM Envizi - ESG Suite / Base Platform 2 Future consideration

The UX Work Planner App should be accessible to the Cloud Field Services Authorized Licence Users

Currently the client (HSE) Users with IBM Facilities and Real Estate Management on Cloud Field Services Authorized licence can NOT access the UX Work Planner app. The impact is that users are unable to do work task assignment through UX App. (Note...
12 months ago in IBM TRIRIGA Operations & Maintenance Management 1 Not under consideration

Click on application name on navigator does not work with larger texts

When using Maximo Mobile App, users noticed to enter in an application that contains larger texts for example "Inspection Record for", on smaller screens user see something like "Inspection Recor... if we click under the name Inspection Recor.... ...
5 months ago in IBM MAS - Mobile 1 Not under consideration

Allow User Specific Extensions of System XML

Today, users add custom configurations to System XML when they want to add columns to dialogs and created new menus. These changes get overwritten when IBM releases new versions of these objects (LIBRARY.XML, MENUS.XML).A System/Org/Site level ext...
5 months ago in IBM MAS - Manage (Base) / System Admin Config/Security 0 Future consideration

Our Use Case is to link from a Software Requirement written in Doors next to a Rhapsody Element (outgoing link: traces).

According A-Spice the linking should be as following:System Requirement <-- System Design <-- Software Requirement. Our Requirements are written down as artifacts in Doors Next. Our Design is modeled in Rhapsody. So there is a need to link a...
over 1 year ago in IBM Engineering - Requirements Management DOORS Next / Feature 1 Future consideration

White labelling - IBM Maximo Mobile

Our Client wanted white labelling the Ibm Maximo mobile application (ios and android) to "New Name" with their choice. Where they can do below : Change the login page to customer designed. Add Customer Logo everyplace where IBM's i.e. login page. ...
7 months ago in IBM MAS - Mobile 1 Planned for future release

Ability to Remove the change password function on User profile card at the top right corner once log in natively.

Native log in User password managment is centralized. Where native user where not suppose to change their password by themselves. However since now password can be easily update by native user using that change password function at the profile car...
10 months ago in IBM TRIRIGA Application Platform 1 Not under consideration

Compobox for Enumlation Type

Rhapsody supports to define Enumeration type and Attribute and Variable typed the enumeration type.However users need to input the literal value of the enumeration type by text.I request Users can input a literal value of Enumeration Type by selec...
about 4 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Modeling and UI 0 Future consideration

Maximo Assignment Manager extend date range from one week to four

Planners/supervisors would benefit from this, because they could look and schedule beyond a single week.
2 months ago in IBM MAS - Scheduler 0 Under review