Skip to Main Content
IBM Sustainability Software - Ideas Portal
Hide about this portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

IBM MAS - Scheduler

Showing 117

Add workorder status filtering option to Graphical week

It would be useful when you for instance work with this weeks schedule and you want to filter out the workorder that have already been completed. It might be different people that need to be able to filter with the workorder status. Scheduler need...
6 days ago in IBM MAS - Scheduler 0 Future consideration

Add a visual identifier on each Work Order to show the lock / unlock status in Graphical Scheduling application

In the “Graphical view” tab, the current functioning allows to lock or unlock a Work Order with the button “Lock/Unlock schedule”. The only way to check out the locking status is to find among all buttons the right one, identify its state and repe...
about 1 month ago in IBM MAS - Scheduler 0 Future consideration

Add Ability to Filter by Work Order in Graphical Assignment - Assignment View

We deal with a lot of small assignments and it gets extremely difficult to manage and see multiple assignments that exist for one Work Order. Although they are highlighted blue when we select one of them, we would like the ability to use a filter ...
12 days ago in IBM MAS - Scheduler 0 Future consideration

Allow choosing the colour of Work Order in Graphical Scheduling application

In the “Graphical view” tab, the colour of each horizontal bar is based either on the Work Order status or on the Work Order's “End date” overcoming (which is defined in the main tab “Schedule” and materialized by a vertical red line on the schedu...
about 1 month ago in IBM MAS - Scheduler 0 Future consideration

Enable Optimization (Auto Scheduling/Assignment) in Graphical Work Week Application

Currently, Graphical Work Week Application helps to schedule and assign work in one single screen. Introducing optimization capabilities through optimization templates, would really help in performing automatic work scheduling and assignment. Auto...
29 days ago in IBM MAS - Scheduler 1 Future consideration

Add the Ability to Zoom in to a Day and Zoom out to 2 weeks in Graphical Work Week

In Graphical Work Week, assignments that are 30 minutes long are small slivers in the timeline view. It would be helpful to be able to zoom in to a single day to better work with those assignments. Also, it would be helpful to be able to zoom out ...
over 4 years ago in IBM MAS - Scheduler 5 Future consideration

Enable a labor assignment without craft distinction in Graphical Assignment application

In “Assignment view” tab, a skilled labor is spread in many craft groups. Consequence #1 : A planner or a scheduler can’t have a visual overview on all remaining period of availability for each labor. This information is not exactly known until an...
about 1 month ago in IBM MAS - Scheduler 1 Future consideration

Display the “Start no earlier than”/ “Finish no later than” dates for easily identify Work Order constraints in Graphical Scheduling application

On the schedule area in the “Graphical view” tab, the solid red line is currently common for all Work Order / Task. It leads to confusion because it refers to the “End date” defined in the “Schedule” main tab rather than to a limit not to cross. T...
about 1 month ago in IBM MAS - Scheduler 0 Future consideration

Proposal for Enhanced Functionality: Managing One-Time Shift Changes via Resource View

Within IBM Maximo Scheduler, we work with two alternating work patterns, where employees switch between day and evening shifts every two weeks. While this setup functions well for standard scheduling, there is currently no efficient way to apply a...
about 2 months ago in IBM MAS - Scheduler 1 Future consideration

Enable Rotational Shift for the labor

In Maximo Labor application, the system would allow to assign a shift for the identified Labor. In the real time scenario, there might be a case where his current shift would get changed every 2 weeks. In such case, the shift needs to be manually ...
26 days ago in IBM MAS - Scheduler 0 Future consideration