Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....
PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...

All ideas

Showing 5829

'Monthly Data Summary Report' - restricting 'Actual Days' to maximum days in a month

We noticed that sometimes the number of 'Actual days' in the 'Monthly Data Summary Report' is duplicated as a result of multiple records entered manually or via connector for the same period of time. Additional records for the same period of time ...
12 months ago in IBM Envizi - ESG Suite / Base Platform 2 Future consideration

Limit connections for a user and/or ip address

1. For QM, CCM & DNG we need to be able to stop concurrent JTS user authentication logins (whether via GUI or API) using a single user account.2. As we have many automations connecting to RM, CCM & QM instances to get data via OSLC REST AP...
12 months ago in IBM Engineering - Foundation/Common Services 2 Not under consideration

OCL verification support

Users can write their constraints by OCL(Object Contraint Language) on Contraint model for their model.However, they can't do verification of their models by their constraints.I want Rhapsody support to do verification of their models by constrain...
about 4 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Modeling and UI 0 Future consideration

[Envizi] Add export menu to export CSV file encoded with UTF8 + BOM

If we go account page, and select export menu of CSV file, we get CSV file encoded with UTF-8 without BOM. Then we double click and open this CSV file with Microsoft Excel, Excel shows garbled characters. Microsoft Excel can open the CSV file enco...
3 months ago in IBM Envizi - ESG Suite / Base Platform 0 Under review

Dynamic ouput name for Report in Shared report

The idea is to rename the ouput file from shared report dynamically with variable set by users. For example : If my Variable is = 78, my ouput word named “SSUD-0000-VRD-ADST-6000076597_EdXX_DR_VNR-PROD-<iteration>_Report_RQM.doc” If my Varia...
3 months ago in IBM Engineering - Test Management / Test Execution 4 Future consideration

Remind users if a Change Set (CS) is older than one week and not delivered yet

Current behavior: Currently a lot of change sets are created by users but forgotten that they are open or not found any more, since it's not known how to find them.Finally we have a lot of old CS also containing changes no one knows if they are st...
12 months ago in IBM Engineering - Requirements Management DOORS Next / Usability 0 Future consideration

Support OpenID Connect for federated authentication

For those using Azure Active Directory (AAD) for federated identity and seamless single sign on because of a multi-domain setup, we need to use a more modern authentication protocol than SAML, the OpenID Connect protocol based on OAuth2 is the mos...
about 2 years ago in IBM MAS - Common Services 0 Planned for future release

Display Inspection Form Instructions By Default

In Work Center inspections, the form header appeared before the user could continue to the inspection form, as shown in the attached. In Mobile inspections and Role Based Application inspections, this is no longer the case. Instead, the form loads...
over 1 year ago in IBM MAS - Mobile 1 Planned for future release

Maximo Mobile Technician and EAM My Schedule are based on assignments but the individual assignee can only COMP the entire WO or Task not the individual assignment .

When more than one assignment is on a WO or Task, the assignees can see and perform the work in the MM apps but there is no way for each assignee to report their individual assignment is Complete. Instead they either must manually coordinate among...
over 1 year ago in IBM MAS - Mobile 2 Planned for future release

Require e-Signature on Completing Inspection from RBA/WorkCentre/Mobile

Problem Statement: When a technician is performing an inspection and completing it, they are able to confirm the inspection without an e-Signature. Business Impact : When Maximo is used by a clients in the Life Sciences domain, the data is strictl...
6 months ago in IBM MAS - Manage (Base) / Asset/Work Management 1 Future consideration