Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...
PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....

All ideas

Showing 2974

UX: Ensure User Input Variable Support with "Generate Later"

Currently, under Reports, there is a column: Generate Therein, are 2 icons/options: Generate Document; Generate Later.Generate Later, does NOT provide any of the necessary User Input screens for the User to provide the necessary values of key vari...

When both Monitor and Manage are used, give me an easier way to inherit dimensions from Manage for devices instead of manually defining dimensions and associating them.

In Maximo Manage, I specify information about assets such as Classification, Classification Attributes, Asset Type, etc. I should be able to use this information to inherit dimensions about the sensor device attached to an asset instead of manuall...
over 1 year ago in IBM MAS - APM 0 Future consideration

Allow devices that are attached to assets to be published as part of the Asset hierarchy from Maximo Manage to Maximo Monitor

Devices such as sensors are attached to assets. Many customers track these OT devices as assets within Maximo Manage. These devices are usually tracked as a child asset attached to a parent as a sub assembly. We should provide the option to publis...
over 1 year ago in IBM MAS - APM 0 Future consideration

Rotate Floor Plan View from New Drawing manager and or DSP

When viewing floor plans, it is useful to be able to change perspective on the view of the floor plan view. The rotates could be 90 degree from a button press and potentially manually grab the image and adjust ad-hoc viewing angles.
about 2 years ago in IBM TRIRIGA Space Management / Dynamic Space Planning 1 Future consideration

Fix the bug where sorting in the PO -> Copy PR Lines to PO dialog causes data integrity errors.

Good afternoon I was able to replicate this in our OOB Demo environmentApp Server IBM WebSphere Application Server 8.5.5.13Version Tivoli's process automation engine 7.6.0.9-IFIX20190718-1538 Build 20171127-0100 DB Build V7609-45 HFDB Build HF7609...
about 2 years ago in IBM MAS - Manage (Base) 3 Future consideration

Drag facility in the frame of diagrams to reduce or increase the frame size

We would like to have drag facility in the frame of diagrams so that by just dragging we can reduce/increase the frame size See the attached screen-shot
over 5 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Modeling and UI 1 Future consideration

DNG : Warn the user when he wants to delete a tag applied to one or more artifacts

In a DNG component, we have some modules and we define a shared or personnal tag. In a first module, we apply the defined tag on some artifacts.In another module, we apply the same defined tag on some artifacts. We return to the "Manage Tags" func...
about 2 years ago in IBM Engineering - Requirements Management DOORS Next / Feature 0 Future consideration

Book Temp Workspace via Outlook Plugin

Outlook is a commonly used tool to book meeting room space. Description: For a positive user experience, we would like users to be able to book temporary workspace using the Outlook Tririga Add-In.
over 4 years ago in IBM TRIRIGA Workplace Experience 2 Future consideration

Need possbility to link a Report with other ELM artifacts e.g. EWM Work Items

There shall be the possibility to link a report with an ELM Artifact. The report should be bi-directional. For EWM a related link or a resolves/resolved by!link is sufficient. Use-case: - link a development plan item e.g. Feature with the report w...
over 1 year ago in IBM Engineering - Reporting / Report Builder 1 Future consideration

Slow loading permissions in large projects, change load sequence to allow the Admin to set filter first

System: DOORS Next Gen, Manage this Project AreaActor: DNG Administrator As a DNG Admin, I need to manage permissions. Upon selecting permissions in a large project. DNG begins to load permissions by ROLE & Everyone. I then have to wait and wa...
over 5 years ago in IBM Engineering - Foundation/Common Services / Administration 4 Future consideration