Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....
PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...

All ideas

Showing 5825

Sync the scope of content in sections according the hierarchy navigated as the breadcrumb menu at the top.

Issue: 1. We browsed a Test Plan, Plan A and opened the Test Suite section to open Suite A.(as Open Test Suite in Test Plan.jpg) 2. In the Test Suite, we changed to the Test Suite Execution Records section and found that there is a record was not ...
3 months ago in IBM Engineering - Test Management / Usability 1 Not under consideration

In CCM number of requirements(count) of type implements requirements, attached to a work items is not visible we are currently counting manually.

It will be helpful to see the count of the links. 1. Helps in calculate the load on work item by knowing count of the links. 2. Reduces manual effort of counting 3. It can be integrated visa versa also means in DNG to count the number of work item...
3 months ago in IBM Engineering - Workflow Management / Work Items 1 Future consideration

To capture GPS coordinates from the map (for emmergency SR creation)

Maximo Anywhere can capture and record the GPS location only for the physical place, where the field engineer is. Other GPS location (like behind the river, for example) Maximo Anywhere is not able capture and record at all. The Maximo Anywhere re...
over 3 years ago in IBM MAS - Mobile 1 Not under consideration

Export Compare Configuration for specific Module or Change Set

The 7.0.2 release includes a compare configuration report, which looks super promising. Does this report give the ability to only export a give module? The options appear to only include as specific as Artifacts, which I imagine includes all artif...
over 3 years ago in IBM Engineering - Requirements Management DOORS Next / Usability 0 Not under consideration

Doors Next Needs Server Side Operational Behaviors

In order to add automation to Requirements Management we need to be able to perform actions when an artifact is saved. This would be similar to the use of preconditions and follow-up actions provided in EWM. Examples of things we would like to do:...
about 1 year ago in IBM Engineering - Requirements Management DOORS Next / Feature 0 Future consideration

Market-based emissions report available in the set of CSV extract reports

Easier to consume the Market-based emissions data through the CSV extract mechanism
7 months ago in IBM Envizi - ESG Suite / Scope 1&2 GHG Accounting & Reporting 1 Future consideration

Live excel export from Report Builder - Remove the button "Make the results dynamic"

I export Doors Next data in excel using a report made with report builder and I choose "Download a spreadsheet with live data." After a test, it seems that the button "Make the results dynamic" and the button "Refresh Query results" located in the...
7 months ago in IBM Engineering - Reporting / Report Builder 1 Future consideration

Better, more consistent, understandable name for filter "Limit by lifecycle status"

The filter name "Limit by lifecycle status" is very unfortunate. The naming style is totally inconsistent with all the other filter names such as "Artifact type", "Modified by" or "<some_attribute_name>". All these other filter names describ...
10 months ago in IBM Engineering - Requirements Management DOORS Next / Usability 0 Future consideration

Reservation Space Groups for Series Reservations

Reservation Space Groups doesn't allow Series Reservations and this is preventing client not able to use Space Groups. Please add an enhancement to include reservation space groups for Series Reservations
over 1 year ago in IBM TRIRIGA Workplace Experience 1 Future consideration

direct link between EWM CCM work item and the latest version of EWM SCM artifact

Request: direct link between EWM SCM artifact and EWM Work Items.
over 4 years ago in IBM Engineering - Workflow Management / Source Control 1 Future consideration