Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....
PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...

All ideas

Showing 5971

Add Canadian Emissions factors from IEA/National Inventory to the product

Envizi advertises that we leverage emissions factors from IEA and customers purchase Envizi expecting that the product will manage all factors available. There are factors within IEA that Envizi does not leverage and customers do not understand wh...
4 months ago in IBM Envizi - ESG Suite / Base Platform 3 Not under consideration

[ERM] Link ID outside GC Context display incorrectly

As Requirement Manager, I am facing the following issue: Links that are created in a specific global configuration are displayed correctly in the active link configuration but incorrectly in the inactive link configuration. Further, edit operation...
4 months ago in IBM Engineering - Requirements Management DOORS Next / Usability 0 Future consideration

Use DL for attendee list when reserving a room

Including the use of a distribution list when booking a room helps save time because it avoids having to type an email individually especially if it's a large team.
4 months ago in IBM TRIRIGA Workplace Experience 1 Future consideration

Warning on Job Plans and Work Order Tracking that Planned Labor has mixed references to both tasks and work order

When planning labor on a work order you should either plan against the work order by leaving the task field blank, or you should plan at the task level by always entering a task. Having a mix of the two on the same work order is still valid but mo...
4 months ago in IBM MAS - Manage (Base) / Asset/Work Management 1 Not under consideration

Work Order synonym statuses to indicate the period of planning and scheduling

Work is planned prior to approval but there is no status to say that the work order is waiting to be planned (WPLAN) or that it has been planned (PLANNED). We also want to know how long it took to be planned, hence work order status changes would ...
4 months ago in IBM MAS - Manage (Base) / Asset/Work Management 0 Future consideration

Market-based emissions report available in the set of CSV extract reports

Easier to consume the Market-based emissions data through the CSV extract mechanism
8 months ago in IBM Envizi - ESG Suite / Scope 1&2 GHG Accounting & Reporting 1 Future consideration

Live excel export from Report Builder - Remove the button "Make the results dynamic"

I export Doors Next data in excel using a report made with report builder and I choose "Download a spreadsheet with live data." After a test, it seems that the button "Make the results dynamic" and the button "Refresh Query results" located in the...
8 months ago in IBM Engineering - Reporting / Report Builder 1 Future consideration

Mobile App/Wrapper for Native TRIRIGA to Enable SSO with Biometrics

Goal of this enhancement is to create a mobile wrapper for native TRIRIGA in the form of an IOS/Android App that will enable use of biometrics such as fingerprint or face ID to sign into TRIRIGA. We have a customer that uses TRIRIGA extensively - ...
over 2 years ago in IBM TRIRIGA Cross Functional Application 1 Future consideration

Possibility to filter on link validity attribute

Currently it is not possible to filter on link validity attribute.
over 5 years ago in IBM Engineering - Requirements Management DOORS Next / Feature 2 Not under consideration

IBM Maximo Connector for SAP needs to support Cloud Platform Integration (CPI).

This is a must have requirement for our Maximo customers. IBM Maximo Connector for SAP needs to support Cloud Platform Integration (CPI). CPI is SAP’s cloud-based middleware that allows integration between cloud and on-premise applications with th...
8 months ago in IBM MAS - Manage (Base) / Integration 0 Planned for future release