Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...
PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....

All ideas

Showing 2126

Need E-Mail notification for verify and review also.

Hi, As there is E-Mail notification for Approval, we need the same for review and verification of the work item. Regards,Shubham
over 4 years ago in IBM Engineering - Workflow Management / Work Items 1 Not under consideration

Report Scheduler link should be included in Global Menu

The only link to access the 'Report Schedule' is found by clicking the top level 'Tools' in the Global Menu. I would like the Global Menu to be consistent as need items are added. All links should be abailable within the Global Menu directly inste...
about 2 years ago in IBM TRIRIGA Application Platform 1 Not under consideration

RPE - reporting link validity within RM

I understand it is currently not possible to report on link validity for links between requirements within DOORS Next (i.e. not going out to RQM or other platforms). We would like to to use the link validity function between requirements, and an i...
about 2 years ago in IBM Engineering - Lifecycle Optimization Publishing / Unassigned 4 Not under consideration

Hide Left Nav Bar based on security group

we need an ability to hide the start center based on security groups. so non IT people wont be seeing the left NAV bar
about 11 years ago in IBM MAS - Maximo IT 4 Not under consideration

Make Identify tool dropdown layers in order from Map Service

When using the identify tool the drop down does not return the list in the expected order.This makes the tool confusing to the users, that expects to see a Set As Current button, but sometimes the tool picks by default another random record that i...
almost 9 years ago in IBM MAS - Spatial 1 Not under consideration

Filtering on "Current" Iteration of timelines

Using multiple timelines in a project area is used to allow different teams in the project area to plan their work independently. Typical example for this is teams working in parallel on different versions or variants of the same product. Therefor...
over 2 years ago in IBM Engineering - Foundation/Common Services 3 Not under consideration

Need the ability to create reports using ELM for Git commit data.

We have links in ELM between Git commits and RTC work items. Currently, there is no way to generate even basic reports on any Git information. Having this ability is highly valuable for analysis purposes.
over 2 years ago in IBM Engineering - Lifecycle Optimization Publishing / Integrations 2 Not under consideration

CLA execution cannot handle the network interruptions at test machine or RQM server

Currently in the CLA, when the execution completes, the adapter tries to post the data and fails with an exception "Failed to send data" where the execution stops.This is mostly observed when there are many Test Cases to be executed in a Test Suit...
almost 7 years ago in IBM Engineering - Test Management / Unassigned 2 Not under consideration

Flag to supress warnings when opening a model via command line

When opening a rhapsody via cmd line, multiple windows open, see https://www.ibm.com/mysupport/s/case/5003p00002hCc7DAAS/rhapsodycl-does-not-generate-code?language=en_US Please add a cmd line flag to supress this warning or otherwise let us contro...
over 2 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Rhapsody Client 1 Not under consideration

Delta Data from Doors Next - retrieve only updated artefacts including only changed links

We from Reporting extract the data from DNG for reporting purpose. We are trying to get the "Delta Data" (Artifacts which are modified from specified data), based on "Modified ON " field. But whenever there is only change in Link information, then...
over 2 years ago in IBM Engineering - Requirements Management DOORS Next / Integrations 1 Not under consideration