Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...
PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....

All ideas

Showing 5979

Allow documents to be attached to a lease without requiring a contract revision

Currently in TRIRIGA, the process to attach a document to a lease requires the lease to be put into revision using the data revise option, attach the document, and submit for required approvals.We would like to be able to attach documents to a lea...
over 5 years ago in IBM TRIRIGA Real Estate & Lease Accounting Management 2 Planned for future release

Enable tags with multiplicity in a hierarchical manner

We would like to utilize tags for many use cases, e.g., safety analysis, interface specification, etc. To improve the productivity of such tasks, we would like to use tags with multiplicity, e.g. block1.tagA[0]=True; block1.tagA[1]=False;block1.ta...
over 3 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Modeling and UI 0 Future consideration

SSO login for BI reports

SSO login to be used for BI reporting rather than a separate individual login process. Able to share PowerBI reports through SSO and set notification contacts through SSO.
over 1 year ago in IBM Envizi - ESG Suite / Base Platform 2 Future consideration

[Envizi] Thai language support

Thailand is attracting semiconductor factories and international companies are building semiconductor manufacturing plants in Thailand. Japanese semiconductor manufacturing companies are strengthening their factories in Thailand and are considerin...
6 months ago in IBM Envizi - ESG Suite / Base Platform 0 Future consideration

[JRS]: Add system alerts feature for JRS

We are using System Alerts to display a message on the application tow arn our users when there are maintenance, migrations or outages. We are displaying this message on all applications wich have the System Alerts feature (ie: jts, ccm, rm, qm). ...
6 months ago in IBM Engineering - Reporting / JRS 4 Future consideration

Please support cvs, svn and git as configuration management in Rhapsody as Eclipse Integration removed from Rhapsody 10.

Please support cvs, svn and git as configuration management in Rhapsody as Eclipse Integration removed from Rhapsody 10. What's new in Rhapsody 10.0 https://www.ibm.com/docs/en/engineering-lifecycle-management-suite/design-rhapsody/10.0?topic=rhap...
6 months ago in IBM Engineering - Systems Design Rhapsody/RMM / Integrations and APIs 1 Future consideration

Ability to duplicate the test artifacts when duplicating the test plan

Problem: When we duplicate the test plan, currently it has the option to link to the original artifacts that the original test plan links to. We are looking for an option to duplicate the test artifacts as well, when the test plan is duplicated. W...
over 3 years ago in IBM Engineering - Test Management / Test Execution 2 Not under consideration

Make Rich Text fields' font by default bigger

All users report that they cant read whats written in any rich text field. We understand that it can be changed by the user, however, by default, it should be at least the same size as other fields.
over 2 years ago in IBM MAS - Manage (Base) 1 Not under consideration

Stream creation time stamp

As developer or team lead i expect a version control tool to report to me the EWM stream creation date at a quick glance i.e right click on stream and the properties to show the stream creation date
over 2 years ago in IBM Engineering - Workflow Management / Source Control 3 Future consideration

Make transactions in STM more clear

Transitions in STM are not really clear. Can we make more space between Trigger and Guard or make them in different colors?
over 1 year ago in IBM Engineering - Systems Design Rhapsody/RMM / Rhapsody Client 1 Future consideration