Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...
PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....

All ideas

Showing 533

Routes should be status controlled

Request for having status codes on Routes As an Asset Operations Manager (AOM), I need to ensure that my PM generated work orders consist of my approved Job Plans and that Routes attached to the PMs contain the route stops I have chosen, so that I...
over 1 year ago in IBM MAS - Manage (Base) / Asset/Work Management 2 Delivered

Maximo does not notify second user if the same work order is opened and edited by first user

Maximo allows to open the same work order record by two different users and edit at the same time without notifying the second user at the beginning of the edit that the work order being edited is being modified by another user. This allows both u...
over 10 years ago in IBM MAS - Manage (Base) 3 Delivered

View the chapter of a document which owns a specific requirement Numéro de ticket

It should be useful to have possibility to know that association chapter with a search and that the result could also display their positioning in a document.
over 5 years ago in IBM Engineering - Requirements Management DOORS Next / Feature 4 Delivered

GWW - Additional Resource Columns

In Graphical Work Week there should be additional columns to select and filter by. For consistency Default Vendor, Crew Assignment, Work Location and Work Zone are fields found in the Graphical Assignment application. The Supervisor field should a...
almost 4 years ago in IBM MAS - Scheduler 1 Delivered

During user deletion in MAS, the administrator should be asked if PII data needs to be removed before user deletion

During user deletion in MAS, the administrator should be asked if PII data needs to be removed before user deletion and if customer wants to delete this data then all PII fields need to be removed Preliminary list of fields Given Name Family Name ...
6 months ago in IBM MAS - Manage (Base) / System Admin Config/Security 0 Delivered

MAXIMO WORKORDER.PCPHYS Physical Percent Complete field allows values of 999,999,999,999

Work Order Tracking application WO Percent Complete should not exceed 100. While testing our demo environment 7.6.1, it was found that Work Orders would accept Physical Percent Complete values up to 999,999,999,999 due to the underlying field WORK...
almost 6 years ago in IBM MAS - Scheduler 3 Delivered

Modify the installer to prompt if environment will be production or non-production

MAS 8.9 includes a new capability where the system administrator can specify if the environment is for production / non-production. This is an important capability because it affects the app points usage - non-production environments will require ...
almost 2 years ago in IBM MAS - Common Services 2 Delivered

Allow closed code review to be reopened by Project Administrator

User case to allow closed code review to be reopened by Project Administrator 1.Author performs accept operation in their workspace 2.As part of accept operation there is a merge conflict and the default change set called "Merges" is created in au...
almost 2 years ago in IBM Engineering - Workflow Management / Work Items 2 Delivered

Issues and Transfers (RBA) - There is no visibility on the reservation type allowing you to issue against a soft reservation

In the Role Based Application (RBA) for Issues and Transfers, in Issue Reserved Items there is no reference to the type of reservation. In many cases only HARD or APHARD reservations will be issued, SOFT and BACKORDER will probably never be issued...
12 months ago in IBM MAS - Mobile 2 Delivered

IBM Tririga Automate - OMP package deployment

Hello Team,We would like to understand any possibility of programmatically deploy the OM packages in to Production without any manual interruptions.
6 months ago in IBM TRIRIGA Application Platform 2 Delivered