Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....
PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...

All ideas

Showing 2810

Command for ignoring white space in RTC

As we have an option to ignore white space in eclipse and visual studio clients during comparing file in RTC source control, expecting an option for the same using command-line interface. The SCM teams automated the merge operations using the comm...
almost 4 years ago in IBM Engineering - Workflow Management / Source Control 1 Future consideration

PreCondition Set in "Require Workitem Approval" does not detect changerequest linked from another EWM server

Expectation: I want to allow delivery of RMM Changeset only when a linked ChangeRequest are Approved Note : ChangeRequest should be part of another EWM Server Problem: Cannot deliver changeset linked to Approved Change Request from another associa...
almost 2 years ago in IBM Engineering - Workflow Management 2 Future consideration

Establish a field like the discussion field also for other elements like review comments

The discussion field is used to document user entries with a specific time stamp. This functionality is also helpful for other use cases, e.g. to store review findings or something else. But unfortunately the discussion field can only be used once...
almost 4 years ago in IBM Engineering - Workflow Management / Work Items 2 Future consideration

Problems during Build Synchronization in RTC Clinet and Jenkins

There are build synchronization inconsistencies Observed in various cases that are confusing to users. Detailed use cases & it's expected results are attached in the file.
almost 4 years ago in IBM Engineering - Workflow Management / Build 2 Future consideration

Add the ability to change column configuration (left to right / top to bottom) display settings when performing a comprehensive export of a test plan.

This feature would make comprehensive exports of test plans much more aesthetically pleasing to the viewer. The current export stacks the step columns in the Top to Bottom view, while we develop and execute our procedures using the Left to Right v...
almost 2 years ago in IBM Engineering - Test Management / Unassigned 0 Future consideration

"Select a Machine to run this test" dialog shows no machines for commandline Adapter

As per the business use-case, we are trying to add the test script in the test suite directly and run against the test cases added in the test suite of a test plan. Test script what is created is a command line adapter type. Issue here is we are u...
almost 2 years ago in IBM Engineering - Test Management 1 Future consideration

Move precautions from Site level data to Org level data so that precautions can be shared across sites

Here’s an example of what’s gained by moving the ‘Safety Precautions’ application to the Organization level: A major corporation owns and operates several power plants, located at different sites, throughout the Northeast. Since the nature of the ...
almost 2 years ago in IBM MAS - Manage (Base) / Asset/Work Management 0 Future consideration

Update minimum password complexity settings to comply with CMMC IA.2.078

CMMC has minimum password complexity requirements that aren't satisfied with current password options in DOORS.
almost 2 years ago in IBM Engineering - Requirements Management DOORS/DOORS Web Access / Configuration 0 Future consideration

Need to be able to use reporting service to show links between Test Plans and Module Views

Currently if you link a Test Plan to a module view there is no way in the Reporting Service to show the trace between the Test plan and the Module View. It simply shows NO relationship not even to the module that the view is part of. This is a cri...
almost 2 years ago in IBM Engineering - Requirements Management DOORS Next / Usability 0 Future consideration

[Shifts] Tasks must always be scheduled in the original scheduled shift (Team continuity)

After the first operation of a task is scheduled in one shift, the rest of the task must always be scheduled in that initial shift.
almost 2 years ago in IBM MAS - Scheduler 0 Future consideration