Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...
PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....

All ideas

Showing 5971

Space Assessment: Ability to enable/disable layers on the assessment floor plan view.

When using Space Assessment, customer require the ablity to enable/disable layers on the assessment floor plan view.
over 3 years ago in IBM TRIRIGA Space Management 3 Future consideration

Please support User Date and Time attribute as Reqif exchange in Doors Next

Please support User, Date and Time attribute as Reqif exchange in Doors Next If Reqif does not support XMLSchema#date/XMLSchema#time/XMLSchema#user, please use other type like string or datetime in stead. Expected Behavior User Data type in Doors ...
over 3 years ago in IBM Engineering - Requirements Management DOORS Next / Feature 0 Not under consideration

GitHub shall be part of Global Configuration

Global Configuration shall offer the possibility to include Git Commits stored in GitHub.Navigating to commits in GitHub shall be as comfortable as it is possible in RTC.
over 5 years ago in IBM Engineering - Workflow Management / Integrations 1 Not under consideration

Allow Manage Admin to inactive user

For MAS now is only MAS admin to control user status and sometime there are 2 difference admin to manage user status, that cause Manage Admin cannot manger their own user account.
over 1 year ago in IBM MAS - Manage (Base) 1 Functionality already exists

Liberty server should forward to the /maximo context

The Manage URL (ie: https://prod.manage.mydomain.com) , when entered into a browser without a context, shows a default WAS liberty profile landing page. This should be modified to forward to the /maximo context
over 3 years ago in IBM MAS - Manage (Base) / Workflow 2 Functionality already exists

Impossibility to modify a "Data Type" of an "artifact attributes"

In Doors NG, when I go to "Manage Component Properties", I can create an "artefact attribute". So, I create one.Next, I want to modify the "data type" of this "artefact attribute". Sadly, it is not possible. Consequently, my workaround is to delet...
over 6 years ago in IBM Engineering - Requirements Management DOORS Next / Feature 5 Not under consideration

in-app reviews require opening 5 to 10 tabs to complete

How to get just what you changed for review and shows links for that. Prefer to do inside the tool, but difficult.Not being able to conduct reviews in the tool and the difficulty of exporting a change set to a document to facilitate review outside...
10 months ago in IBM Engineering - Requirements Management DOORS Next / Usability 2 Not under consideration

No multi-component-set view

The inadequacy of the change set views and exports when it comes to links to/from other components. i.e. not having a “multi-component-change-set” sort of view.
10 months ago in IBM Engineering - Requirements Management DOORS Next / Usability 2 Not under consideration

Create Report Doesn't have all the information required to do the review

On Compare ConfigurationsMissing text/attributes. Not enough context to review the changes. Will also fail on modules with broken links.
10 months ago in IBM Engineering - Requirements Management DOORS Next / Usability 2 Not under consideration

Reports take a long time

For a review packet. Reports take a long time. Takes 20 min. Last day of sprint it is a long time to wait, especially if multiple modules at 20 min each it adds up.
10 months ago in IBM Engineering - Requirements Management DOORS Next / Performance 2 Future consideration