Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...
PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....

All ideas

Showing 2825

Download preloaded database if new version is available on Maximo when Delta option is enabled

With the Delta option enabled, Mobile will ignore the preloaded database and always do a delta from the local database with Maximo. In this scenario, the problem starts when the user doesn't sync his Mobile for many reasons: no new WO is assigned,...
7 months ago in IBM MAS - Mobile 4 Future consideration

Baseline Year in Monthly dataset

Many organisations benchmark their current performance against their Baseline year. Every company sets a baseline year. Many clients of Envizi import historical data from their baseline year. There is no option to add baseline year in a powerrepor...
3 months ago in IBM Envizi - ESG Suite / Base Platform 2 Future consideration

Add Functionality to send reports with parameters from an escalation or add a condition field to report administration

Escalations should have a third tab next to Actions and Notifications to be able to send a report with its parameters. There a times where we want to monitor certain things where situations may or may not occur. Rather than having one communicatio...
about 2 months ago in IBM MAS - Manage (Base) / Reporting 0 Future consideration

add bluetooth libraries to the container-app

Provide the ability to connect bluetooth peripherals to maximo mobile by adding the prerequisite libraries to the public published native apps. This would allow end-user to configure the apps to connect seamlessly to a myriad of smart-meter, IoT, ...
6 months ago in IBM MAS - Mobile 2 Future consideration

TrsValidation using URIAliasing for cross-server communication

TrsValidation isn't using URIAliasing for cross-server communication so we want to implement the idea to change this so that TRSValidation will use URIAliasing.
about 1 month ago in IBM Engineering - Foundation/Common Services / Performance 2 Future consideration

Enable ability to create a report of historical trends on requirements workflow states in ELM

Hi Team, We would like to create a report of historical trends on requirements workflow states. Initially, considering the links below, it seemed to be possible. https:/www.ibm.com/docs/en/engineering-lifecycle-management-suite/lifecycle-managemen...
about 2 months ago in IBM Engineering - Reporting / Report Builder 1 Future consideration

Support for WEF, GRI, TNFD, ISSB frameworks

As EY are being enabled as an Envizi Partner, we need support for more ESG frameworks in the Sustainability Reporting Manager, since our teams are preparing disclosure reports based on those frameworks. Thank you!
12 months ago in IBM Envizi - ESG Suite / ESG Reporting Frameworks 5 Future consideration

Historical Reporting on DOORS Next and ETM Artifacts

It is currently possible to create historical reports through JRS Report Builder on EWM artifacts. However, it is not possible to historically report on any DOORS Next or ETM artifacts because they use the LQE data source (or in our case, LQE usin...
13 days ago in IBM Engineering - Reporting / JRS 1 Future consideration

Automated extraction of data from uploaded documents

To have the ability to upload an invoice to Envizi and for the pertinent information to be extracted would be a game changer and save so much time. The auditability of the data would be second to none and the way it would help avoid human errors w...
3 months ago in IBM Envizi - ESG Suite / Data Connectors & Integrations 0 Future consideration

Improve loading time of Remote artifacts

Loading artifacts in Rhapsody takes sometimes a very long time, and also no real feedback or progress bar is provided. In general also the RMM connection almost doubles the loading times of models on the client side, as measured in our projects. R...
5 months ago in IBM Engineering - Systems Design Rhapsody/RMM / Integrations and APIs 1 Future consideration