Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....
PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...

All ideas

Showing 5839

Bulk copy responses

Please add the ability to bulk copy responses across related questions so that clients can copy responses from related questions over to the desired framework instead of going
about 2 months ago in IBM Envizi - ESG Suite / ESG Reporting Frameworks 0 Under review

Extend the user management functions.

The User management function in MAS currently shows an overview of the configured users, but does not show what MAS user type (Limited, Base, Premium) they are. To be able to see this information, each user account has to be opened individually. T...
about 1 year ago in IBM MAS - Common Services 2 Functionality already exists

Enforce Link Constraints when User changes Artifact Type

Enforced Link Constraints enable consistency of trace and trace reports. Link constraints are assigned to artifact types. Since a user can change an artifact type, the link constraints for the new type should be applied during the change. Should a...
3 months ago in IBM Engineering - Requirements Management DOORS Next / Usability 0 Future consideration

Provide support for Rhapsody/RMM model reviews

We need a possibility to perform delta reviews on Rhapsody models. This could be achieved by a similar approach as for code reviews. Currently the review tooling only supports text diffs which are not appropriate for Rhapsody model reviews. It sho...
6 months ago in IBM Engineering - Systems Design Rhapsody/RMM 1 Future consideration

VET Change one line in the WOMaterialStatusUpdateCronTask crontask so problems with the process can be identified much quicker

Modify the code to change the error message that is logged Current code in the IBM crontask /* 174 */ getCronTaskLogger().error( "WOMaterialStatusUpdateCronTask encountered a error." , e ); Requested change. /* 174 */ getCronTaskLogger().error( "W...
over 1 year ago in IBM MAS - Manage (Base) / Asset/Work Management 0 Future consideration

API for updating and extracting data

Required for Envizi to be the central system of "the truth". If its not possible to integrate with other internal systems Envizi will become a secondary reporting system for ESG data.
almost 2 years ago in IBM Envizi - ESG Suite / Data Connectors & Integrations 4 Future consideration

Consider Resource / Crew Assignment when control the Resource load and Availability in Graphical Scheduling

How it works today During the Planning/Scheduling phase, Graphical Scheduling is used to decide whether work orders can be executed based on resource and crew availability. The Graphical Scheduling calculates availability by dealing with Calendar/...
8 months ago in IBM MAS - Scheduler 1 Future consideration

Anomoly model minimum threshold should use the field in the UI and not hard coded to 50%

The MVI anomaly model will detect low confidence anomalies rather frequently on normal parts and then display them in the results of the image. Even though MVI Edge has s UI field to setup "minimum" confidence levels for objects detected, it doesn...
8 months ago in IBM MAS - Visual Inspection / MVI Edge 0 Planned for future release

Need to be able to set Logger configuration back to default

In the Logger configuration we can change the logging level of each logger. After having done the debug, it would useful to reset all the changes back the default/original setting. Should have a button on the top to reset.
7 months ago in IBM Engineering - Requirements Management DOORS Next / Administration 0 Future consideration

Contribution Percentage value at station and/or the CU level in CU Estimating

Business Case: When establishing CIAC (Contribution in Aid of Construction) cost through CUE in some cases a customer may only be required to reimburse us a certain percentage of a span or CU. For example, if the customer is required to reimburse ...
10 months ago in IBM MAS - Utilities 2 Future consideration