Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....
PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...

All ideas

Showing 5786

DNG artifacts removal without warning about existing links to RTC causing back link warning in RTC

Scenario: A DNG artifact within a module was linked to a RTC work item. The DNG artifact was removed from the module before the link to RTC was removed. Then an user tried to remove the link from the RTC work item but the tool was not able to find...
over 2 years ago in IBM Engineering - Requirements Management DOORS Next / Usability 1 Future consideration

Delete multiple views using API or GUI

Our team are experiencing repeated views inside a module when delivering changes and we would like a way to be able to delete them in batch. This could be with the GUI in the module or via a REST API approach. Currently there seems to be no way to...
over 3 years ago in IBM Engineering - Requirements Management DOORS Next / Feature 0 Not under consideration

Unable to create connector link between proxy ports via Complete Relations feature in Rhapsody

In a Block definition diagram if you have an inherited proxy port and a proxy port and connect them with a connector it works fine. Now if your remove from view this connector and try to create it back via Layout-> Complete Relation-> All. T...
over 3 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Modeling and UI 1 Future consideration

Allow common asset meter history across sites

System allows assets to be moved between the sites, but asset meter history remains in the original site. This created a problem for preventive maintenance as there is no meter history in the new site and preventive maintenance is skipped. In addi...
over 7 years ago in IBM MAS - Manage (Base) 0 Future consideration

RTS Story Progress Bar not representative of actual progress

The length of the Story Progress Bar is not representative of the actual progress. The attachment shows an example. The actual progress is 95% but the bar is only about half way along, i.e. 50%. Although the information in the pop up is correct, t...
over 6 years ago in IBM Engineering - Workflow Management / Work Items 3 Not under consideration

Changing the pre-selected data filters in data reports

Currently for one of our clients, the data reports have changed to filter by GRESB tags. This has caused issues for us and can potentially cause a lot of issues for the clients or property managers downloading data as half of the portfolio does no...
over 1 year ago in IBM Envizi - ESG Suite / Base Platform 2 Not under consideration

Need to be able to upload a template and have all dynically referenced templates be uploaded with it (inlcuding updating the dynamic references)

Currently we have to manually deploy 20+ templates from the local file system to the document builder server, then update the main template dynamic references to point to the new locations on the server. Each update takes approx 5 minutes to compl...
over 1 year ago in IBM Engineering - Lifecycle Optimization Publishing / Documentation Builder 1 Not under consideration

Make personal dashboard accessible via home button again

In v. 6.0.6.1 personal dashboards were accessible via a single click on the home button, which is no longer present in v. 7.0.2. Many users miss this old feature and would like to have it back as a usability improvement for the new UI. Currently, ...
over 2 years ago in IBM Engineering - Foundation/Common Services / Usability 1 Not under consideration

Ability to Move Projects

Looking for an out of the box feature that will move EWM projects from 1 server to another.
over 2 years ago in IBM Engineering - Foundation/Common Services / Administration 2 Not under consideration

Set the name of a report using Report Resource based on an RPE template

I created a Report Resource based on an RPE template. When I use it, the report is generated correctly. But the name of the report is "Report.doc". When I export several Report, they all have the same name. It would be better if we could set the ...
over 2 years ago in IBM Engineering - Workflow Management / Reporting 1 Not under consideration