Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....
PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...

All ideas

Showing 5759

Epic - Solutions History

While closing a ticket the helpdesk engineer enters an adhoc solution. When user reopens the ticket and it moves through the normal process flow, the solution provided earlier is rewritten. If this is not an approved solution this is not saved any...
almost 4 years ago in IBM MAS - Maximo IT 5 Not under consideration

Can't Create View in Baseline then Export to Excel

In order to export a custom set of attributes from DNG in Excel, you need to create and save a View. If the stream you do this from is a baseline, then you can't create the view. This is a serious problem as once you baseline something, you can on...
about 5 years ago in IBM Engineering - Requirements Management DOORS Next / Feature 3 Not under consideration

In EWM Eclipse client, provide an option to open a Project Area (in Team Artifacts view) as Read-Only

I had two project ares open in EWM Eclipse client. One (production) I was looking at the process configuration to help me decide what to change in a 2nd project area (test area). I inadvertenly changed production and caused a few headaches. If the...
over 1 year ago in IBM Engineering - Workflow Management / Usability 1 Not under consideration

Editing the "Name" property from the UI is strange...

User feedback that when editing the "Name" property of a requirement in the UI for a module, the text initially is greyed out when editing is activated, forcing the user to click a space or backspace to make the attribute editable and then proceed...
over 2 years ago in IBM Engineering - Requirements Management DOORS Next / Usability 0 Future consideration

See changes to configuration from within an active change set

User without permissions to modify component attributes needed another option in an enumerated list. A user with appropriate permissions added the enumeration to the list. But the user was unable to see the change in the context of a change set th...
over 2 years ago in IBM Engineering - Requirements Management DOORS Next / Usability 0 Future consideration

User request to support "Tab" entry in text fields

User request to be able to use "Tab" character in DNG Requirement attributes to assist with formatting.
over 2 years ago in IBM Engineering - Requirements Management DOORS Next / Usability 0 Future consideration

Enhancement of user friendly in RTC Planning UI to easliy click "save" button

When I change work items in a plan, I have to scroll all the way up to the head of the site in order to achieve the "Save" button. Atlassian Confluence shows a better way: after scrolling one or two lines up, the "Edit" button occurs and can be us...
over 2 years ago in IBM Engineering - Workflow Management / Planning 2 Not under consideration

Type Ahead hardcoded limit of 10000 should be configurable

Currently the Type Ahead limit is hard coded to 10000 records so we cannot use it effectively on the Locations and Asset fields as we have more than 10000 records. At times users don't find the record in the type ahead thus loosing confidence in t...
over 1 year ago in IBM MAS - Manage (Base) / System Admin Config/Security 3 Not under consideration

Update Change Set Access

Change Sets can be modified by anyone in DNG. Typically, this is controlled in that only by sharing the URL to the Change Set can someone obtain access to a Change Set. However, if you link a Change Set to a RTC Work Ticket, any user can access th...
about 5 years ago in IBM Engineering - Requirements Management DOORS Next / Feature 2 Not under consideration

Plan snapshots should be based on plans, not plan views

Currently, if you have Fetch Children on Demand selected, comparing the plan with a snapshot results in all the unfetched items to be reported as removed. This is counterintuitive, and it's effectively mixing the data layer (i.e. the plan) with th...
over 2 years ago in IBM Engineering - Workflow Management / Planning 1 Future consideration