Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....
PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...

All ideas

Showing 5836 of 5836

Draft review/approval routes without sending

Using RQM 6.0.3 with iFix 9 on Linux I observed that you cannot add and save an individuals name to a review/approval route without immediately sending them a notification of a task.
over 6 years ago in IBM Engineering - Test Management / Usability 4 Not under consideration

When inheritance is applied , Stereotypes and associated Tag should also be inherited

I intent to use inheritance for a Block. Unfortunatly the Stereotypes and Tags are not inherited Scenario to reproduce - Create BlockA-Create BlockB-Create Stereotype S1 with Tag T1 and make it applicable to Class-Assign Stereotype S1 to BlockA-Dr...
over 4 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Modeling and UI 1 Future consideration

Purge Based on Timestamp with Metadata

Ability to purge data based on given timestamp field found with metadata , within a specified time range.
about 2 years ago in IBM MAS - Visual Inspection / MVI 2 Planned for future release

In Graphical Scheduling and Graphical Work Week, on the Graphical View tab when the Work is filtered update the row count to reflect the count of the current filter rows

e.g., work list has 300 rows with no filters, filtering by crewworkgroup reduces and displays 15 of 300
about 2 years ago in IBM MAS - Scheduler 0 Future consideration

Better Mail Configuration structure

Dear Jazz Team, currently there it is really confusing for users to configure Mail settings for ETM. There are two different ways for configuring mail settings: 1) In the profile of the user there is a mail configuration [1 - ETM_profile] In add...
about 2 years ago in IBM Engineering - Test Management / Usability 0 Future consideration

DNG : Tag modification is not always reported in the Compare and Deliver dialogs

The goal of this RFE is to improve the behaviour below so that the users know in the Compare dialog in the GUI, what was modified, but are still the same in both streams To reproduce: -create a CM enabled project -create a Requirement -add a Pers...
about 2 years ago in IBM Engineering - Requirements Management DOORS Next / Usability 0 Future consideration

Add "Read Only" change management constraint to individual streams

It is not uncommon to have a single stream that represents the production state of a component design. Work on the system takes place in work streams that are branched from the production state and, after suitable review and approval, merged into ...
over 2 years ago in IBM Engineering - Requirements Management DOORS Next / Feature 0 Future consideration

Data Restriction Doesn't Effectively Applied to Linear Graphical View

Dear Sir/Madam, Our transportation client has different departments managing different type of assets, all base on same linear chainage. We set data restriction on different user groups to view different asset type, but linear graphical view fails...
over 2 years ago in IBM MAS - Manage (Base) / Linear 0 Not under consideration

Option to choose multiple associated artifacts to remove from a associated artifact

Option to choose multiple associated artifacts to remove from a associated artifact. It is difficult for the users to remove the associated artifacts .It is requested to give the option in column when added or in the selected artifacts links section.
over 4 years ago in IBM Engineering - Requirements Management DOORS Next / Usability 0 Not under consideration

Need Checkbox to select the link types which are to be copied while doing copy requirements

Need Checkbox to select the link types which are to be copied while doing copy requirements or modules to another folder in the same project area.
over 4 years ago in IBM Engineering - Requirements Management DOORS Next / Usability 0 Not under consideration