Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...
PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....

All ideas

Showing 5825

Emptying Trash must not affect Baseline

Emptying trash actually also remove the purged artifacts from Baselines.That means a baseline can be affected years later after its creation by such an action and detection is very difficult since it is incomplete and it is not obvious which artif...
5 months ago in IBM Engineering - Test Management / Administration 2 Future consideration

Support to select which page is shown in File preview instead of first page

Sometimes when using e.g. Word Plugins to generate flow charts, Word stores the script on first page and the actual flow chart is on second page. This is not usable for users viewing Modules: they would like to see the flow chart instead of script...
3 months ago in IBM Engineering - Requirements Management DOORS Next / Usability 0 Future consideration

Life Sciences requirement: Protect Rotating Asset Due Date

Metrology users would benefit from Due Date (TOOLTRANS.PLUSCDUEDATE) field to be read-only when reporting a Rotating Asset on a calibration work order.
8 months ago in IBM MAS - Manage (Base) 1

Life Sciences requirement: Enhance Standard Deviation Calculation

Metrology users would benefit from an ability to calculate standard deviation for repeatability asset functions to ten decimal places.
8 months ago in IBM MAS - Manage (Base) 2 Not under consideration

Add photos to mobile gallery

The idea is to have photos that we are using with MAXIMO MOBILE application be included in the cell phone photo gallery.
over 1 year ago in IBM MAS - Mobile 0 Not under consideration

Make the common permission properties editable in 1 location

User Permission change to Attributes at the Project Level for Multi-Component Projects User defined permissions to artifacts and attributes are managed at the Project scope till Configuration Enabled then at the Stream scope per component. When pr...
about 2 months ago in IBM Engineering - Requirements Management DOORS Next / Usability 0 Future consideration

Functional Safety Baseline Integrity Assurance

ELM could be used in support of Functional Safety Development Applications but only after qualifying the system and its Enterprise usage to 3rd Party Certification Body. As this comes at great expense to the ELM Customer and having just received t...
about 2 months ago in IBM Engineering - Requirements Management DOORS Next / Usability 3 Future consideration

Integrating BIM with Maximo

We have a solution for one of our projects to integrate Maximo with BIM model. So, the normal way is to use Revit Model with COBie sheet to achieve custom implementation but unfortunately our client doesn't need to work with COBie sheet. Why we do...
about 2 months ago in IBM MAS - Manage (Base) 0 Under review

Simple ETM Export

With Simple ETM Import capability comes the obvious simple ETM Export Capability. XL or CSV based output easily configured and enabled from the Project Scope to gain a quick external to ETM view of the entire set of Plans, Suites, Cases, Scripts, ...
about 2 months ago in IBM Engineering - Test Management / Usability 0 Future consideration

Simple ETM Import

DNG has a nice user-friendly import capability. ETM does not. Given the Enterprise usage and application of DNG with ETM it only sets up the user expectation to have a pleasing experience of both importing and exporting to and from DNG in a compar...
about 2 months ago in IBM Engineering - Test Management / Excel & Word Import 0 Future consideration