Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....
PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...

All ideas

Showing 3019

Ability to configure user required fields and messages to conform to customer business rules

Ability to configure required fields and messages to conform to customer business rules
3 months ago in IBM MAS - Reliability Strategies 0 Future consideration

When writing Work Orders in Maximo, able to see a flag/notify that the FMEA has a recommended Control (Job Plan)

When writing Work Orders in Maximo, able to see a flag/notify that the FMEA has a recommended Control (Job Plan)
3 months ago in IBM MAS - Reliability Strategies 0 Future consideration

DNG LQE Report don't have "Modified By" attribute

DNG LQE Report is not showing “Modified By” attribute. We are able to see “Modified By” attribute in DNG UI under requirement attribute type but the same attribute is not available in LQE report. DNG UI: LQE Report:Not able to find “Modified By” a...
7 months ago in IBM Engineering - Requirements Management DOORS Next / Feature 0 Future consideration

Usage of PUB scrips in RPE by scriptname and not by ID

If you are going to use javascript from PUB (assets --> scripts) in RPE the you can add a javascript with content similar to that: <Script src= "library://api/scripts/104"></Script>. Unfortunately you have to use the key instead of ...
almost 2 years ago in IBM Engineering - Lifecycle Optimization Publishing / Unassigned 6 Future consideration

Bulk deletion of cross application links

Hello team, The enhancement idea is to have the feature to bulk delete the links from selected artifacts. The cross application of deletion of links is currently not possible in bulk.
over 1 year ago in IBM Engineering - Requirements Management DOORS Next / Feature 0 Future consideration

PM Forecasts do not reflect Dynamic

It seems the PM Forecasts remain being calculated as static. I tested it with two PMs having the same Job Plan assigned to it, with different Total Work Units assigned on Job Plan Sequence. Forecast Costs, when calculated, came up as identical.Her...
over 4 years ago in IBM MAS - Manage (Base) 3 Future consideration

Force user to set a new password, triggered by customization

Because of company mailing policy, the [Reset Password] button does not work, and we solve password reset with customization tools. However the newly set password - with addUser (szDoorsName, szPassword, ""); OR u.password = szPassword; on the fir...

Add command-line support for single-package RPE report generation

Currently, in Rhapsody, we can extract a single-package report by navigating to Tools > Publish > Report using Auto Generated Template or Report using User Specified Template. However, when generating a report using an RPE template via the c...
4 months ago in IBM Engineering - Systems Design Rhapsody/RMM 2 Future consideration

Include attributes behind the link to Excel Export from View

When Artifact has Link to another Artifact, it is possible to define up to 5 attributes behind the Linked artifact be visible in the View. If user saves the selections as View, and makes Excel Export, the attributes behind the link are not in the ...
4 months ago in IBM Engineering - Requirements Management DOORS Next / Usability 0 Future consideration

All email link need to redirect to GC contexte rather than local stream

All email send by QM (and I guess RM, but our today issue is related to QM) need consistency in link used. Exemple : After declaring a Formal review , user receive an email ("New Review")=> this first email link to a GC stream Next, user receiv...
7 months ago in IBM Engineering - Test Management / Email Notification 0 Future consideration