Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....
PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...

All ideas

Showing 2854

Allow duration to be modified in Graphical Work Week using inline editing

It is common for a supervisor to adjust duration when assigning work. Right now the only options are to drag the bar which only drags in 1 hour increments or update the End Date. It would be a huge usability improvement to allow duration to be upd...
over 2 years ago in IBM MAS - Scheduler 1 Future consideration

Reqif Mapping Mechanism

DNG shall have a feature to have a mapping mechanism before importing Reqif files from other third party requirement management applications. If the mapping concept is available it will not create artifact types, attributes, data types etc., from ...
about 2 years ago in IBM Engineering - Requirements Management DOORS Next / Feature 2 Future consideration

Maximo GenAI operator for troubleshooting oil and gas plants

It is a AI expert system where the RAG generative AI technology can assist the human operator in discovering the plant's units issues and resolve them with least impact on the operational and production costs.
3 months ago in IBM MAS - Oil & Gas / HSE 2 Future consideration

Tririga QR code creation for occupiable spaces in tririga, space management.

The QR code creation would help keep creation in one system, versus multiple system maintenance. The QR code would keep up with the space and help maintain spaces in the space management system. A workflow creation for groupmove would be created f...
about 1 year ago in IBM TRIRIGA Workplace Experience 2 Future consideration

selective TRS indexing for GC baselines

GC baselines are created routinely, for example at the end a sprint and these can be very large. TRS indexing of these baselines is expensive and there should be an option to omit/selectively index baselines
7 months ago in IBM Engineering - Requirements Management DOORS Next / Unassigned 0 Future consideration

Add link information to files in EWM repository

•I want to be able to register link information in the link tab of files managed by EWM. •Like attached file, I want to be able to add the 1 artifact link in the DNG module to the link tab of the file managed by EWM.
over 2 years ago in IBM Engineering - Requirements Management DOORS Next / Feature 1 Future consideration

Revise REORDER Calc for tighter control and take Lead Times into consideration.

There are companies ordering and maintaining stock with extra long lead times, and has considerably increased with the advent of COVID.
over 1 year ago in IBM MAS - Manage (Base) / Supply Chain 3 Future consideration

Restricting Access at Stream Level

Current RM access regulation is only possible at project level, or at a team level. There should be a way to restrict access at stream level. When we want to restrict users to work/edit only on their respective stream and not the Master stream, th...
over 6 years ago in IBM Engineering - Requirements Management DOORS Next / Feature 5 Future consideration

Technician (RBA) - Inspection status to be indicated by change of icon and/or colour.

When an inspection occurs on the work order, task or on the multiple assets, locations records, the same button icon is displayed, but there is no indication as to whether the inspection has started or whether it is completed or still in progress....
10 months ago in IBM MAS - Mobile 0 Future consideration

Deactivate classifications for new work order records

We would like to deactivate some deprecated classifications used on either workorder, asset, locations, etc and avoid reporting new records using those classfications. I mean these classifications need to be available for searching but will not be...
10 months ago in IBM MAS - Manage (Base) 0 Future consideration