Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....
PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...

All ideas

Showing 5787

Enable Long Paths in Windows 10 for Rhapsody

We are faced windows long path issue. As our models get more complex, the artifact names get longer and the package hierarchy gets deeper.To avoid name collisions and editing conflicts, we try to split units as much as possible and maintain the hi...
over 3 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Modeling and UI 3 Future consideration

Life Sciences requirement: Ability to display visual plotting of past calibration readings

Metrology users would benefit from a visual plotting of past calibration readings for a given instrument in relation to upper and lower control limits.
9 months ago in IBM MAS - Manage (Base) 1 Functionality already exists

Enhance multiproject and team management

We developing electronic control units, the developement for those is usually seperated in multiple domains. Those domains move with different velocities and not all are organiazed in the ALM envoironment. Production and logistics for example have...
about 2 months ago in IBM Engineering - Workflow Management / Planning 1 Future consideration

Combining Market-Based emissions data into the Monthly Data Summary report

Add Market-Based Emissions data into the Monthly Data Summary, instead of being a seperate PowerReport. At the moment we need to download both reports and create our own PowerBI dashboard outside of Envizi to be able to display both market-based a...
about 2 months ago in IBM Envizi - ESG Suite / Scope 1&2 GHG Accounting & Reporting 1 Future consideration

Feature Request: Add Sorting/Filtering for Uncommitted Work Orders in Graphical Scheduling

In the Graphical View tab of the Graphical Scheduling application, planners often manage multiple work orders within their schedule. When changes are made, the modified work orders are highlighted in blue italics (Out-Of-Box behavior). However, th...
about 2 months ago in IBM MAS - Manage (Base) / Asset/Work Management 0 Under review

Remove inspection forms.

Our clients have many inspection forms that they want to remove but there is not option for that. They can Inactivate them, but it is not enough due the information still displaying in the inspection list and these forms are garbage.
5 months ago in IBM MAS - Manage (Base) / Asset/Work Management 1 Future consideration

ReqIf import: No hidden, non-alterable mapping tables which can mess up a project area

Overview, use case: We want to exchange requirements with a customer who uses DOORS Next, too. We have already set up a project area with the same requirements i.e. same artifacts and same attributes as our customer. Our customer modifies some of ...
over 1 year ago in IBM Engineering - Requirements Management DOORS Next / Feature 0 Future consideration

Highlight Changes to Job Plan During Revision Process

Job plan revisions are a critical feature in the Maximo application. This feature allows organizations to adjust the job plan to address changes in requirements while ensuring the history is maintained. One of the biggest challenges for an approve...
over 3 years ago in IBM MAS - Manage (Base) 2 Not under consideration

Optimization of EAR rebuild & redeploy to reduce Maximo production Downtime

The objective is to find a way to externalize custom java code and specific properties (contained in the maximo/applications/maximo/properties folder) to have in the EAR file only the Maximo standard code and in the second part only properties and...
about 9 years ago in IBM MAS - Manage (Base) 2 Not under consideration

App restart button

As we roll EDGE out there are opportunities for EDGE to run on non-physical hardware like VMs or just running on a physical PC but the PC is not at the location its in a data center. Either way, it would be nice to have a button for the Admins of ...
4 months ago in IBM MAS - Visual Inspection / MVI Edge 0 Planned for future release