Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....
PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...

All ideas

Showing 2831

Mobile App/Wrapper for Native TRIRIGA to Enable SSO with Biometrics

Goal of this enhancement is to create a mobile wrapper for native TRIRIGA in the form of an IOS/Android App that will enable use of biometrics such as fingerprint or face ID to sign into TRIRIGA. We have a customer that uses TRIRIGA extensively - ...
about 2 years ago in IBM TRIRIGA Cross Functional Application 1 Future consideration

Need menu option to revert toolbar positions to default

The Rhapsody interface should provide an option to restore / revert all toolbar positions to their defaults. These defaults should be determined the first time Rhapsody is launched and / or the user should be able to specify a new default.
almost 4 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Modeling and UI 1 Future consideration

Cygwin/MinGW/Linux: ar command with outdated arguments

Currently related Makfile use ARFLAGS=-rvu. But the 'u' modifier requires timestamps, which may be disabled during compile time of ar() with 'D' argument. In this case ar issues a related warning : ar: `u' modifier ignored since `D' is the default...
4 months ago in IBM Engineering - Systems Design Rhapsody/RMM / Code and Execution 1 Future consideration

GWW - Manually Split Assignments

In Graphical Work Week application the duration of a work order or assignment may be longer than the hours of a shift. The GWW application automatically splits the work bar according to the available hours in the shift of the labor or crew it is a...
almost 4 years ago in IBM MAS - Scheduler 4 Future consideration

Include in the artefact history the version/baseline information

Current situation: The artefact history does not include any version/baseline information and it is difficult to track modifications based on a version of an artefact; only possible by checking the Modified date. Required situation/Proposal: The a...
12 months ago in IBM Engineering - Test Management / Usability 1 Future consideration

Add capability to reuse artifacts from different Project Areas and Components

Currently it is possible to re-use Artifacts within the same Component only. This is very restrictive and leads to unnecessary copying of Artifacts. It is a big problem Global configuration is in full use, and setup includes a lot of Project areas...
almost 2 years ago in IBM Engineering - Requirements Management DOORS Next / Usability 0 Future consideration

Issues and Transfers (RBA) - Charge information on work order and task need lookups

In the Charge Details of an Inventory Usage line the work order and task should have a lookup. This could be limited to the set of work orders which have been downloaded to the device when offline, it is likely that when creating an inventory usag...
4 months ago in IBM MAS - Mobile 0 Future consideration

DNG Template handling and distribution

We define the standard development process and methods for the entire development part (~6000) developers. Since the artefact types and the attributes are part of the information model, those are tight to the process and method releases. There are...
4 months ago in IBM Engineering - Requirements Management DOORS Next / Administration 0 Future consideration

Test Script Traceability with Test Case in approved state

Use Case description : - Add custom workflow with three state in RQM project (Draft, In Review, Approved) - Create a test case (TC1) and set the state to “Approved” (The test case has passed all the technical reviews and can be used. It should not...
over 1 year ago in IBM Engineering - Test Management / Usability 0 Future consideration

Implement Customer Satisfaction Survey on UX

Today on UX, Customer Satisfaction survey is not managed
almost 5 years ago in IBM TRIRIGA Space Management 2 Future consideration