Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....
PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...

All ideas

Showing 5836

Include category value names in baselines

Current situation: When creating a baseline, the set category value of an artefact is baselined. However, when changing the name of the category value, the changed value is also displayed in the baseline. Proposal: Include the name of the category...
6 months ago in IBM Engineering - Test Management / Configuration Manager 0 Future consideration

SMTP configuration needs to Support TLS-Certificate-based Office365 connectors

Our SMTP email server requires sender to present client tls cert. This capability is currently not available in MAS sendmail module. We ask that a change to be made with the TLS client authentication and the addition of SMTP configuration paramete...
2 months ago in IBM MAS - Common Services 0 Planned for future release

Ensure units are included in all Power BI reports

When working in Power BI, I cannot figure out which units are being reported in the visualizations. This should be tied to the data pulling in and automatically include the units in the visualization. When I pull in the "unit of measure" data fiel...
2 months ago in IBM Envizi - ESG Suite / Base Platform 1

Create a more complete view that presents at the same time the information of "Sand Box - Repository Workspace - Stream"

Create a more complete view that presents at the same time the information of "Workspace - Repository Workspace - Stream" Information to display: Object Name, Repository Workspace Name, Stream Name, version in RW, Version in Stream, Creation Datet...
2 months ago in IBM Engineering - Workflow Management / Unassigned 1 Needs more information

Set Financial Years for Classification Groups

Currently Envizi only allows the financial year to be defined at the Organisation level and this is applicable for all data reported across the platform. However, some customers have complex organisational structures and within this, different bus...
2 months ago in IBM Envizi - ESG Suite / Base Platform 1 Not under consideration

Don't have organizational preferences for "Dashboard Maximum Timeline Period" impact the PowerReport data

We have found that the organizational preferences seem to dictate the data shown in the PowerReports. I was having an issue where data from a certain month/year and beyond was not showing up, despite having all of the fiscal years and months that ...
2 months ago in IBM Envizi - ESG Suite / Scope 1&2 GHG Accounting & Reporting 1 Future consideration

[IDz]Modify the menu API to facilitate the modification right click's menu

There are many menus in the IDz that need to be customized. However, this is a tough task. In order to customize the menu, actually, we need to go inside the standard EWM and Eclipse source code to find out the concerned XML, classes. We can list ...
2 months ago in IBM Engineering - Workflow Management / Source Control 4 Under review

Inventory Receiving - Unit of Measure of the order should be displayed

In the Inventory Receiving Role Based Application and the Inventory Receiving option there is no reference to the order unit of measure being received. There should be the Order UOM in at least the Receive screen but also the Inspect screen, i.e. ...
10 months ago in IBM MAS - Mobile 1 Future consideration

Linking Test Script Step Results to Requirement using Excel Importer Utility

In 7.0.3 it is now possible to link test script step and requirement. 'TestScript that link steps with existing requirements 002' from sample folder for test script step and requirement linking.(v7.0.3) Usually the links from test script step Resu...
about 1 year ago in IBM Engineering - Test Management / Excel & Word Import 0 Future consideration

Audit trail for deleted artifacts

Deleted artifacts are gone with no trace they existed. Project History should log deletes, including ID, Name, user, and time of delete. This allows the distinction between artifacts that cannot be found vs artifacts deleted.
over 5 years ago in IBM Engineering - Requirements Management DOORS Next / Feature 4 Not under consideration