Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....

IBM MAS - Manage (Base)

Showing 965

Linear - Create Static Linear Meters

There is currently no control to say that a meter on a linear asset is at a fixed location, meter readings can be taken at any measurement along the linear asset, or the meter reading is associated with a fixed asset. There are cases where you wa...
about 2 years ago in IBM MAS - Manage (Base) 1 Future consideration

For better UI UX, categorize the 1000+ system properties in the UI similar to how those properties are categorized in IBM Docs, then users will be able to easily query system properties by category in the UI.

Within the MAS>Manage UI (within System configuration>Platform Configuration>System Properties) the 1000+ system properties are not categorized in the UI but are categorized in IBM DOCS. Therefore users in the UI can filter the system pro...
about 2 years ago in IBM MAS - Manage (Base) / System Admin Config/Security 1 Not under consideration

Enhancement to Meter Based PMs

When job plan sequencing is used on Meter Based PMs AND there is a sudden spike in the reading Maximo does not adjust to pull the accurate JP but issues a work orders as per the job plan sequence. The JP Selection logic assumes that meter reading ...
almost 9 years ago in IBM MAS - Manage (Base) 1 Future consideration

Feature to allow more granular management of queries, assign group level queries instead of all or none public model

In some SSCD applications, our user have hundreds of queries. We need SSCD to allow more granular management of queries, assign group level queries instead of all or none public model. This will help users customize their favorite queries.
about 11 years ago in IBM MAS - Manage (Base) 2

Billing schedule Floating vs. static

Author: Hanna SelkirkIn Maximo Service Provider and the applikation "Customer Agreements (SP)" it is possible to set up a billing schedule for the customer that generates bill batches based on a set schedule.We have noticed that this schedule is a...
over 4 years ago in IBM MAS - Manage (Base) 1 Not under consideration

Maximo Inspections - PARENTWO InspectionResult Record Should Be Deleted If WO Is Deleted

When an Inspection Form is populated on a WO and the WO is saved, or its Status is progressed (depending on a System Property), an InspectionResult record is created with ReferenceObject set to "WORKORDER", ReferenceObjectID set to the WONum of th...
about 2 years ago in IBM MAS - Manage (Base) / Asset/Work Management 0 Planned for future release

Maximo Invoice number Missing sequence

We understand that Maximo Invoice numbers are generated in sequence. However, if user clicks on ‘New Invoice’ icon into the Invoices applications and decides Not to Save the record; then in this case that particular Invoice Number will be Missed/L...
about 2 years ago in IBM MAS - Manage (Base) 1 Not under consideration

Enable End Users with visibility into KPI performance

From a Customer Success POV, it is important that customers can see clearly how the application is providing them benefits. To that end, we should ensure that customers have a way to see these KPI results (and CSMs can underscore that performance ...
about 2 years ago in IBM MAS - Manage (Base) 0 Future consideration

Have any meter reading entered from an Inspection into the WOMETER table when that inspection was raised from a work order

Today, when you enter a meter reading from the work order, it is logged into the WOMETER and the other relevant meter reading tables, however, when the reading is entered via an Inspection that was raised from a work order, it is not. In order to...
about 2 years ago in IBM MAS - Manage (Base) 0 Future consideration

SAP adaptor code assumes bother maximo and SAP resides in same timezone

SAP adaptor code assumes both Maximo and SAP resides in the same time zone and all the dates in different adapter codes are converted into database time instead of the timezone where the other system is located. For more details case TS003609405 c...
over 4 years ago in IBM MAS - Manage (Base) 0 Future consideration