Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....
PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...

All ideas

Showing 5966

Be able to work on different versions of a stream without redoing a load

We need an improvement on EWM 6.0.6 for Eclipse. We have components in different version of a stream (see image Capture1.jpg). Sometimes we need to work on 2 versions at the same time (ex TSBD_6.0 and TSBD_DEV). We create 2 repository workspace. W...
over 2 years ago in IBM Engineering - Workflow Management / Source Control 3 Not under consideration

Repotool command "executeDiagnostics" should support to run specific diagnostics and not only all

Unfortunately, it is currently only possible to run all diagnoses in batch using the repotools "executeDiagnostics" command. Therefore it would be helpful if the name of the individual diagnosis that is to run via repotools can be given as an addi...
over 3 years ago in IBM Engineering - Foundation/Common Services / Administration 1 Future consideration

Enhancement of OSLC API: allow including attachments in test case results

Good evening, We have noticed that when we consult the information of a Test Case Result of “Scriptless Result” type, the xml generated using OSLC API and the xml generated using the Reportable REST API have different information. In order to alig...
about 1 year ago in IBM Engineering - Test Management / Integrations 0 Future consideration

Ability to create a custom section with custom attributes/categories

There should be an option to display custom attributes and categories should under a custom section, not the Summary section. For example, there should be an option to display custom test case categories and attributes under a custom section on a ...
over 2 years ago in IBM Engineering - Test Management / Usability 0 Future consideration

Allow merging of approved artifacts in ETM

Problem: Artifacts with workflow state "Approved" in target stream cannot be merged because of corresponding precondition preventing saving of approved artifacts. There is no way to specifically exclude merging activity from such preconditions. Ch...
over 3 years ago in IBM Engineering - Test Management / Integrations 1 Not under consideration

RTC javascript method to access the authenticated user.

Hi, There is the need to have access to an authenticated user using the calculated javascript, this will allow us to make the smart decisions in the calculated values base and who login ins. currently, we can't use ModifyBy because is not consiste...
over 4 years ago in IBM Engineering - Workflow Management / Work Items 1 Future consideration

Feature to create NewTerm elements from existing SysML elements (ProxyPort).

We are working with new term elements which extend the existing SysML elements. With this we are trying to extend ProxyPort (SysML elements) but current Rhapsody version doesn't support this. So we created NewTerm element of type Port and generali...
over 3 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Modeling and UI 1 Future consideration

Provide a Filter by Link Validity on test cases views

Provide a filter on the Link Validity column to be able to select all "Suspect links"/"Valid Links"/Invalid Links"
about 7 years ago in IBM Engineering - Test Management / Usability 3 Not under consideration

Create a Field that appears dynamically based on the value of a Test Case Category.

We would like to know if it's possible to create a Field that appears dynamically based on the value of a Test Case Category. Link: https://rtc.intel.com/rqm0002001/web/console/NDSW%20Validation/_g25G0D7nEeixg_y9Zzbqew#action=com.ibm.rqm.planning....
over 4 years ago in IBM Engineering - Test Management / Administration 2 Not under consideration

Functionality or means to “rebase” a change set

DNG simply does not properly handle cases and what it is showing us not reflective of the actual content changed. From what we can gather, when two change sets (say CSA and CSB) are opened and then one is delivered (say CSA), the second change set...
over 2 years ago in IBM Engineering - Requirements Management DOORS Next 0 Future consideration