Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...
PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....

All ideas

Showing 6135

RRDG (RPE) Queue Management Much Better than Current Solution of SERVER RESTART

At present , the number of RPE reports that may be generated by RRDG in DNG is limited by a setting , increasing this count inhibits performance and decreasing this count leads to users being unable to generate documents as all requests are queued...
8 months ago in IBM Engineering - Lifecycle Optimization Publishing / EDG 1 Not under consideration

All Inspections should include also the canceld ones (with Historyflag)

If an Inspection has been canceld there is no way of knowing today. we want to create a query for the role-base-application "Inspection" to get all Inspections. By doing so, the administrator / backoffice can search for specific inspections and se...
8 months ago in IBM MAS - Mobile 1 Future consideration

Inherit "Release links" from parent GC for PGC

When working in config enabled world, we always use changesets to make changes in DNG streams. As you are usually working in a GC context, the tool then automatically switches to your personal global stream. If you need to have links to work items...
8 months ago in IBM Engineering - Foundation/Common Services / Global Configuration Management 1 Not under consideration

SERVICEABILITY - SCADA Historian Connector

The SCADA Historian Connector product documentation and overall information currently available to customers is completely outdated and does not allow a customer to perform the required configuration successfully. Currently, the only avenue a cust...
8 months ago in IBM MAS - APM 0 Planned for future release

Don't show non-working hours in Graphical Scheduler

Don't show non-working hours in Graphical Scheduler in the assignment view.If you indicate in the calendar that a workday is from Monday to Friday and 8 hours per day, the outside working day's and hours are still indicated.
8 months ago in IBM MAS - Scheduler 0 Future consideration

Indicator for existing links of any kind

Having an indicator attribute that shows the existence of any link is much faster than checking the artifacts links section in the sidebar or creating a filter for any possible link. Also OSLC links to RMM and ETM and other external links shall be...
8 months ago in IBM Engineering - Requirements Management DOORS Next / Usability 0 Future consideration

Add Cache Clear WITH Hierarchy Rebuild option to Nightly Cleanup process

From TS008804960, we have long wait times (3-5 minutes) for the Document Manager Hierarchy Tree lo load for the first user of the day. This is caused due to heavy usage of the Document Manager/Uploads via Associated Documents to Work Tasks (totali...
over 2 years ago in IBM TRIRIGA Application Platform 1 Future consideration

Revise REORDER Calc for tighter control and take Lead Times into consideration.

There are companies ordering and maintaining stock with extra long lead times, and has considerably increased with the advent of COVID.
almost 2 years ago in IBM MAS - Manage (Base) / Supply Chain 3 Future consideration

Extended drilldown – add possibilty to configure classstructure into it / show tree of assets

Problem The extended drilldown is a good tool to get a hierarchical overview about data. But it has limited options to show information in tree do easily navigate & identify different data. Additionally, when extended drilldown is opened in ap...
8 months ago in IBM MAS - Manage (Base) / Asset/Work Management 2 Not under consideration

Possibility of defining “Validated by” link constraints between ERM and ETM

See the screenshot "2024-07-09 12_34_01-Window.png". The QM Test Case 364 validate the RM artifacts 45130, 43907, 43390 and 43391 45130 is a "Heading" artifact 43907 is an "Information" artifact 43390 and 43391 are "Requirement" artifacts In our i...
8 months ago in IBM Engineering - Test Management / Administration 0 Future consideration