Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...
PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....

All ideas

Showing 2952

Module View: Provide depth and order for each artifact as system attribute that can also be exportable

Provide access to two system attributes in DOORS Next modules that show the artifact’s Depth (same as Object Level in DOORS) and the artifact’s Order (same as Object Number in DOORS). These attributes should be able to be inserted into a module vi...
about 1 year ago in IBM Engineering - Requirements Management DOORS Next / Feature 0 Future consideration

[DNG]: Search from Find option and Filter/Quick search are inconsistents with multiple space

Use case: In a DNG module, 1. Create an artifact A by typing text (one space): test with one space 2. Create an artifact B by typing text (3 spaces): test with three space With Find function, 3. Search the string test-> You will find 2 results...
8 months ago in IBM Engineering - Requirements Management DOORS Next / Usability 0 Future consideration

UID for Project\Folder should be generated at the time of creation for Migration Package

UID for Project\Folder should be generated at the time of creation for Migration Package to avoid conflicts. This is generated when the export is done. Generating the UID at different times causes confusion\conflict if there is a use case where th...

Accept Changes : Ignore All Option in Accepting Changes instead of Selecting One by One

Hi, During Accept Changes Process, specific change-sets need to be selected rest of them needs to be marked as Ignored for dependent change-sets. From a User Perspective, they want Ignore all button to Ignore all dependent change-sets
10 months ago in IBM Engineering - Requirements Management DOORS Next / Feature 0 Future consideration

Align Published Factor Logic to Calendar Year for AIB, eGrid, Green-e Emission Factor Data Sets

Currently, the applicable date period under the published date logic for AIB, eGrid, Green-e emission factors are mid-year. However, the data within these factor sets are reflective of the attribute mix for a particular calendar year. IEA and DEFR...
5 months ago in IBM Envizi - ESG Suite / Scope 1&2 GHG Accounting & Reporting 2 Future consideration

Alert on existing PMs when status changes on workorder to WAPPR

An alert is supposed to appear when you change the workorder status for which it exists a PM on the same location or asset that will be triggered in the coming days. The problem is that his alert doesn't work when we create the workorder or when w...
over 3 years ago in IBM MAS - Manage (Base) 3 Future consideration

Asset auto-populates from Location entry when the location has a single asset

Add the option to turn off the Asset auto-populates from Location entry when the location has a single asset feature.
over 3 years ago in IBM MAS - Manage (Base) 4 Future consideration

Fix the timeout observed when filter applied with link type

Problem: When a view contains a Link Exists filter with additional filters for linked artifacts, processing such a view may take a lot of time and may result in timeout. This is a known limitation in 7.0.2 version - IBM Engineering Lifecycle Manag...
about 2 months ago in IBM Engineering - Requirements Management DOORS Next / Performance 0 Future consideration

Envizi integration with Carbon Risk Real Estate Monitor (CRREM)

The European Union intends to decarbonize the building sector by 2050. Investment in retrofit could benefit the EU by up to EUR 175 bn per year. One of the biggest challenges for the reduction of GHG emissions results from the poor energy efficien...
over 1 year ago in IBM Envizi - ESG Suite / Building Ratings & Benchmarks 1 Future consideration

Rational Directory Server migration - add the ability to chunk the migration into smaller groups and improve logging

The current implementatio of the LDAP integration uses a migration utility in Rational Directory Administrator 6.0.0.3 to migrate users and groups from one Rational Directory Server to another. When the corporate ldap is large the migration takes ...
3 months ago in IBM Engineering - Requirements Management DOORS/DOORS Web Access / LDAP 0 Future consideration