Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...
PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....

All ideas

Showing 5651

In Graphical Scheduling and Graphical Work Week, on the Graphical View tab when the Work is filtered update the row count to reflect the count of the current filter rows

e.g., work list has 300 rows with no filters, filtering by crewworkgroup reduces and displays 15 of 300
about 2 years ago in IBM MAS - Scheduler 0 Future consideration

Better Mail Configuration structure

Dear Jazz Team, currently there it is really confusing for users to configure Mail settings for ETM. There are two different ways for configuring mail settings: 1) In the profile of the user there is a mail configuration [1 - ETM_profile] In add...
about 2 years ago in IBM Engineering - Test Management / Usability 0 Future consideration

DNG : Tag modification is not always reported in the Compare and Deliver dialogs

The goal of this RFE is to improve the behaviour below so that the users know in the Compare dialog in the GUI, what was modified, but are still the same in both streams To reproduce: -create a CM enabled project -create a Requirement -add a Pers...
about 2 years ago in IBM Engineering - Requirements Management DOORS Next / Usability 0 Future consideration

Add "Read Only" change management constraint to individual streams

It is not uncommon to have a single stream that represents the production state of a component design. Work on the system takes place in work streams that are branched from the production state and, after suitable review and approval, merged into ...
about 2 years ago in IBM Engineering - Requirements Management DOORS Next / Feature 0 Future consideration

Need only the due date of the approval of work item in E-Mail notification

Hi Team, I have been told by the IBM PMR guy to raise this RFE as we need urgent support on E-Mail approval due date, Requirement here is that I want only the due date(ex: 26-Jul-2020) in the E-Mail notification, this due date is of the due date o...
about 4 years ago in IBM Engineering - Foundation/Common Services / Administration 3 Future consideration

Data Restriction Doesn't Effectively Applied to Linear Graphical View

Dear Sir/Madam, Our transportation client has different departments managing different type of assets, all base on same linear chainage. We set data restriction on different user groups to view different asset type, but linear graphical view fails...
about 2 years ago in IBM MAS - Manage (Base) / Linear 0 Not under consideration

Have historical reports available out of the box

We would like to track the traceability along with the dates of transition. TS001070326
over 6 years ago in IBM Engineering - Requirements Management DOORS Next / Documentation 3 Not under consideration

Creation of tags automatically once the model element is created in Rhapsody is not happening

Tags are not creating automatically once the model element is created in rhapsody 8.3.1/8.4.
about 4 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Rhapsody Client 0 Future consideration

Allow users to move columns that are displayed on Work Order Tracking in different order

The FHO business unit has specified 13 columns that must be displayed on Work Order Tracking, which results in users having to scroll right to view all the columns. Users would like the ability to move the columns they use most often for filtering...
over 8 years ago in IBM MAS - Manage (Base) 3 Not under consideration

Hide Process sharing (Master work area) from end users

Hide Process sharing (Master template) from user and only jazz admins can see the screen so that end user doesn't have access to it.
over 6 years ago in IBM Engineering - Foundation/Common Services / Unassigned 3 Future consideration