Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...
PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....

All ideas

Showing 5785

DNG OSLC configuration selection UI should support selection of opt-out baselines

If the project is opt-out, we cannot use the OSLC configuration picker to select the baseline as the opt-out project areas are not listed. Use case: Reporting on opt-out baseline Currently, we have to manually set the "Configuration-Context" for t...
over 2 years ago in IBM Engineering - Requirements Management DOORS Next / Usability 0 Future consideration

Please provide a feature to link existing requirements collection to plan by using Excel Importer

Please provide a feature to link existing requirements collection to plan by using Excel Importer.Currently Excel Importer does not support to link an existing requirements collection to a test plan.
over 4 years ago in IBM Engineering - Test Management / Integrations 0 Not under consideration

Cognos 11 BI Packs

Create a package of standard industry best practice Cognos 11 Dashboards, Visualizations, and Reports for Maximo. We realize these may need to be customized to meet each company's ways of working, but having a package that can be implemented out o...
over 2 years ago in IBM MAS - Manage (Base) / Reporting 0 Future consideration

Remember Lock action in mass update

Sometimes we are doing mass updates on our RTC-managed source files. We have the option autolock (*.*) on the streams. When doing a mass replace we get prompted before overwriting a file. We can choose the option "Yes to All". Unfortunately after ...
over 4 years ago in IBM Engineering - Workflow Management / Usability 0 Future consideration

Create an exclude pattern for autolock

In the stream you can (de)select the autolocking for files. This means, when files are autolocked, the question pops up whether you want to lock the file when starting to edit. When there is no autolock you can start editing straight away.The auto...
over 4 years ago in IBM Engineering - Workflow Management / Source Control 0 Future consideration

Specific Quarterly (Location Specific) Payment Frequency Traditional English Quarter Date mismatch with UK Quarters

Shell is using the Payment Frequency as Specific Quarterly (Location Specific)-->Traditional English Quarter and Shell is expecting to generate the Payments with Correct English Quarter Dates & Amount for UK market. We are facing an issue w...
over 4 years ago in IBM TRIRIGA Real Estate & Lease Accounting Management 2 Future consideration

Report Builder should support tables

Rich text editors in Engineering Test Management allow creating tables in sections like test case results. Those tables are lost in report builder and subsequently in output from Report Builder, e.g. Word/PDF/HTML. Report Builder should support ta...
over 2 years ago in IBM Engineering - Reporting / Report Builder 3 Future consideration

Reviews should show Review Status and time stamp per artifact and Approver

The Reviews and the Reports should show the Review Status for each artifact with a time stamp so that we can tell when an artifact was approved or disapproved and by which Approver. This becomes problematic when there isn't a unanimous decision ma...
over 2 years ago in IBM Engineering - Requirements Management DOORS Next / Feature 0 Future consideration

Can we set licence time out 15 mins instead of dealut 30 mins

if any user ideal for 15 mins , if the licence time out happen means it will help to for the other developer to get the licence
over 2 years ago in IBM Engineering - Foundation/Common Services / Licensing 1 Not under consideration

Duplicate TCERS Should be possible with same Test Plan, Iteration and Environment

Sometimes ,we need to test the same Test Case within same Iteration and Environment on multiple Vehicle Types. So in that case We should be able to Duplicate TCERS and can select a Custom attribute Object type on TCER.
over 2 years ago in IBM Engineering - Test Management / Test Execution 1 Not under consideration