Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....
PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...

All ideas

Showing 2064

Mark crew unavailable if labor in crew is unavailable

If you modify the labor availability for a Labor record and add non working time and that labor is on a Crew, then the Crew should also be unavailable. This should be a configurable option - to either make the crew unavailable or not, depending on...
over 5 years ago in IBM MAS - Scheduler 1 Not under consideration

Integrate M365 SharePoint document links as valid web page attachments for Direct Print in Work Order Tracking

Internal business processes leverage M365 SharePoint libraries for policy and procedure documentation. We'd like to incorporate these attachments (.pdf) as printable web page attachments in the Direct Print function in Work Order Tracking.
about 1 year ago in IBM MAS - Manage (Base) / Asset/Work Management 2 Not under consideration

Allow DOORS 9.7.2.x and beyond to recognize, import, and handle SVG format files

Our modeling team is using Cameo for developing models. While they can export views from the model in traditional various picture format (.jpg, .png, etc.) these do not scale clearly in DOORS, which is our tool of record for requirements. Scalable...
almost 3 years ago in IBM Engineering - Requirements Management DOORS/DOORS Web Access / Import 0 Not under consideration

As an User, I would like to export the report as PDF/Excel in the same format viewed in the Web UI

When you set the order of a column, if the cells have the same content the Web UI will use only one cell to display that data (instead of repeating the same data across all rows of the report). When you export that saved report to PDF/Excel, the d...
7 months ago in IBM Engineering - Reporting / Report Builder 1 Not under consideration

DNG review: Artefact IDs are not shown in comments table in review report.

The current DNG review report has two tables:1. The mapping of artefact names to artefact IDs.2. The comment table. (2) uses the artefact name from (1) as the identification for the comments. This should be changed to the artefact ID. Rational: Wh...
over 3 years ago in IBM Engineering - Requirements Management DOORS Next / Usability 0 Not under consideration

Make the relationship between Conditional UI and security optional

If we want to use the Conditional UI, we are required to use security (a custom sig option) whether our configuration is related to security or not. This is often a waste of effort. It would be helpful if the relationship between the Conditional U...
almost 3 years ago in IBM MAS - Manage (Base) / System Admin Config/Security 4 Not under consideration

Enable DNG to perform in-attribute-field calculations like Excel

DNG should have in-attribute-field calculation capability such that the user can enter a certain character to trigger calculations versus plain text that is untouched. The desired functionality is modeled after Excel's formulas that can be input i...
almost 6 years ago in IBM Engineering - Requirements Management DOORS Next / Feature 6 Not under consideration

in-app reviews require opening 5 to 10 tabs to complete

How to get just what you changed for review and shows links for that. Prefer to do inside the tool, but difficult.Not being able to conduct reviews in the tool and the difficulty of exporting a change set to a document to facilitate review outside...
7 months ago in IBM Engineering - Requirements Management DOORS Next / Usability 2 Not under consideration

No multi-component-set view

The inadequacy of the change set views and exports when it comes to links to/from other components. i.e. not having a “multi-component-change-set” sort of view.
7 months ago in IBM Engineering - Requirements Management DOORS Next / Usability 2 Not under consideration

Create Report Doesn't have all the information required to do the review

On Compare ConfigurationsMissing text/attributes. Not enough context to review the changes. Will also fail on modules with broken links.
7 months ago in IBM Engineering - Requirements Management DOORS Next / Usability 2 Not under consideration