Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....
PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...

All ideas

Showing 5767

Batch-update custom Maximo tables on a schedule

It would be helpful if there were an OOB mechanism that could be used to batch-update custom Maximo tables on a schedule. For example, update a custom WOCOSTROLLUP table each night. Either truncate and reload all rows each time. Or, only merge/upd...
about 3 years ago in IBM MAS - Manage (Base) / System Admin Config/Security 1 Not under consideration

Performance improvement for loading team area with large number of users

​There is a case where large number of users belong to a particular team area. As the number increases, longer it takes to open it to make some change. Some team area takes more than 40 seconds to open up.Having this improvement, usability will im...
about 6 years ago in IBM Engineering - Foundation/Common Services / Unassigned 1 Future consideration

6.0.6 Upgrade Concern: Diable or Hide the JRS Schedule Screen From All AT&T Users To Protect Server Performance

For the TDP-JRS application we desire to have the ability to block or hide the presentation of the JRS Scheduling screen to all users. This IBM feature 6.0.6 Upgrade Feature, that based on our conversations, we believe allows users to schedule an ...
about 6 years ago in IBM Engineering - Reporting / Unassigned 1 Future consideration

Changing workflow-state in the grid is too dangerous

When you change the workflow-state of an artifact in the grid, the mouse click is written in stone. This is too dangerous! If you are not "Pixel-Perfect", you are damned.
about 3 years ago in IBM Engineering - Requirements Management DOORS Next / Usability 1 Not under consideration

Approve labor actuals right in WOTRACK

It would be helpful if we could approve labor actuals right in WOTRACK. It's not possible to do that, since the "Approved?" checkbox is read-only in WOTRACK. There isn't a way to make the "Approved?" field editable via Application Designer. Screen...
about 3 years ago in IBM MAS - Manage (Base) / System Admin Config/Security 0 Future consideration

Button to generate list of IDs from List View resultset

In the List View in any MAM application: Click a button that generates a list of IDs from the List View resultset (max 200 records, or whatever is practical): =WO1000, =WO1001, =WO1002, =WO1003 Possible options: Automatically copy the list to the ...
about 3 years ago in IBM MAS - Manage (Base) / System Admin Config/Security 1 Not under consideration

Make the "Go To Activities and Tasks" button more visible

It would be helpful if IBM could make this button more visible: "WOTRACK-->Task-->Go To Activities and Tasks" Screenshot: https://i.stack.imgur.com/H0UOx.png We didn't know about that button/functionality until recently -- because it was tuc...
about 3 years ago in IBM MAS - Manage (Base) / Asset/Work Management 1 Not under consideration

CUE - Contractor Pricing Should allow outside labor costs to vary with the filter values just as internal labor

Currently there is no easy way to support estimating outside labor costs when the field conditions change. For example, when digging in rocky soil, the filter values can be used to add additional cost for the additional labor required for this sit...
about 12 years ago in IBM MAS - Utilities 1 Not under consideration

RFE - 6.0.6 Upgrade - for JRS Report Scheduler, allow only select people to use the Scheduler

IBM will be installing a JRS Report Scheduler with the 6.0.6 Upgrade. Based on recent conversations with IBM, our opinion is that:1) there is no way to turn off the new JRS scheduler2) automatically delete old report data3) limit its use to a sele...
about 6 years ago in IBM Engineering - Reporting / Unassigned 1 Future consideration

Rational Team Concert CCM Sequential Approvers

The approvers in the boards of approval tab for Change Requests Work Items in Rational Team Concert CCM should be sequential. E.g. the second approver can only approve after the first one did and so on. The order of approvers shall be editable via...
about 3 years ago in IBM Engineering - Workflow Management / Work Items 1 Not under consideration