Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...
PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....

All ideas

Showing 2066

Create view without an outage

Related: Audit tables don't require outage, but custom table does? It's possible to create audit tables without needing admin mode. If that's the case, then why would we need admin mode to create a custom view? The two scenarios seem similar. I wo...
almost 3 years ago in IBM MAS - Manage (Base) / System Admin Config/Security 3 Not under consideration

DNG should allow its API to expose custom artifact attributes for reporting in the ".../traceability/links/link" schema

RDNG XML API should provide access to custom artifact attributes on the Data Source Schema "...>traceability>links>link". This enhancement is much needed for generating traceability reports, which you need to access several attributes fro...
almost 4 years ago in IBM Engineering - Requirements Management DOORS Next / Installation 4 Not under consideration

Enhancement to add auto numbering for figure and Tables in RDNG

Enhancement to add auto numbering for figure and Tables in RDNG
almost 5 years ago in IBM Engineering - Requirements Management DOORS Next / Feature 3 Not under consideration

Paging the huge set of links as it affect the work items performance

The work items with huge set of links should be paged when there are more then X Links (for example X=10) as it takes more than 30 sec. to load
almost 6 years ago in IBM Engineering - Workflow Management / Work Items 3 Not under consideration

JazzIgnore symbolic links

I would like to be able to ignore symbolic links in the files managed in configuration management.As they don't have any extension, it is not possible to ignore them with an extension. Enhancement 392359 closed--> RFE
almost 5 years ago in IBM Engineering - Workflow Management / Source Control 2 Not under consideration

Add a "select all layers" in the floor plans layer manager

Complex BIM models have a lot of layers available in TRIRIGA. For performance optimization, only a few are displayed by default. Activating them manually, one by one, is a burden. Is it possible to create an "Activate all" checkbox on top of the l...
almost 6 years ago in IBM TRIRIGA Application Platform 4 Not under consideration

Easier db config changes in clustered environments

It would be helpful if non-WebShpere admins could make db config changes in clustered environments. In other words, add a field to a table in a clustered environment -- and do it all from within the UI.
almost 3 years ago in IBM MAS - Manage (Base) / System Admin Config/Security 5 Not under consideration

When import RPE report for DNG with EMF diagram images.

1. Background : Customers are using DNG to manage design requirements.And when importing the RPE document created in MS-Word, the EMF images attached to the document is automatically converted to PNG. However, this is an inconvenient feature becau...
about 4 years ago in IBM Engineering - Requirements Management DOORS Next / Usability 0 Not under consideration

Round-Tripping with Word

It seems that a tool that is intended to control change management should allow for changed source material. Customers provide their documents in other mediums than just ReqIf (and Excel is unacceptable). The tool should be able to find difference...
about 3 years ago in IBM Engineering - Requirements Management DOORS Next 0 Not under consideration

Reverse Change Set

It seems that it should be possible for a reverse action could be made, such that a Change Set is automatically created that performs the opposite of the actions done in the selected change set.
about 3 years ago in IBM Engineering - Requirements Management DOORS Next 0 Not under consideration