Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Clear

Ideas

Showing 26 of 7029

Need History of ETM project property change for tracking.

Project team found the project category value were changed by mistake, but not possible to find the history who did this, and what is the previous value to roll back. Need History of ETM project property change to track it.
2 months ago in IBM Engineering - Test Management / Configuration Manager 0 Future consideration

Frozen baseline is needed which not updated according to project category/attribute change

1. Set baseline for previous release.2. Update and delete exist artifact categories3. Check the baseline, the old fixed baseline also have exist artifact categories deleted, and the value of these categories missing. Baseline should be fixed anyti...
4 months ago in IBM Engineering - Test Management / Configuration Manager 2 Future consideration

Restrict access at stream level

Current ETM access regulation is only possible at project level, or at a team level. There should be a way to restrict access at stream level. When we want to restrict users to work/edit only on their respective stream and not the Master stream, t...
9 months ago in IBM Engineering - Test Management / Configuration Manager 1 Future consideration

Enhancement Request: Support for Dual Category Structures in ETM Tool

Current Challenge: Users currently manage multiple relevant categories within their test cases. However, the ETM tool does not support grouping these categories in a centralized or user-defined manner. While an alternative approach—creating a main...
4 months ago in IBM Engineering - Test Management / Configuration Manager 0 Future consideration

OSLC links in ETM to DNG shall be gc configuration context sensitive

Hello dear IBM Team, this idea originates from my support ticket TS016025963 . My request is, that links between an ETM artifact and a DNG artifact are not visible in the ETM GUI if the user is not looking at the data within the proper configurati...
over 1 year ago in IBM Engineering - Test Management / Configuration Manager 2 Not under consideration

Include category value names in baselines

Current situation: When creating a baseline, the set category value of an artefact is baselined. However, when changing the name of the category value, the changed value is also displayed in the baseline. Proposal: Include the name of the category...
over 1 year ago in IBM Engineering - Test Management / Configuration Manager 0 Future consideration

Transitional Risk required for Climate Risk Analytics

Several customers recently have stressed that as well as physical asset risk, they require transitional climate risks to be estimated as well - this is true of the recent RFP submitted for Bank of England, work we are doing with Network Rail and p...
about 1 year ago in Environmental Intelligence Suite: Add-ons / General 2 Not under consideration

TWC Updates on John Deere Case for IBM Support

The customer (John Deere, Co) reported this issue over 115 days ago; we have yet to provide a fix/solution. The problem stems from the method and inconsistent results of the data using HOD - Direct APIs through an automated systems and the respons...
over 1 year ago in Environmental Intelligence Suite: Add-ons / General 0 Not under consideration

Update Lightning Icons

Provide users the ability to have lightning strikes within the lightning alert panel be depicted as dots. This is easier for the viewers to see where strikes occured.
over 3 years ago in Environmental Intelligence Suite: Add-ons 0 Functionality already exists

Merge Configuration Detailed Change Summary

Tracking and reporting change is required by all Enterprise systems. ETM Merge configuration is quite useful at pulling in many changes from one configuration to the next. Most common use case is during test execution while managing test failures,...
about 1 year ago in IBM Engineering - Test Management / Configuration Manager 2 Future consideration