Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....
PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...

All ideas

Showing 5832

in workflow, generally allow Action Lines to be positive or negative

The goal of this RFE is to show that workflow should allow negative Action Lines anywhere that positive Action Lines are used, with the noted exception that Subprocess and Condition nodes should still require one positive and one negative Action L...
over 7 years ago in IBM MAS - Manage (Base) 2 Not under consideration

Improve usability / messaging for users when attempting to "save" personal GC with "Missing Configuration" items.

Would like to see a usability improvement for users taking an action that would result in saving their personal GC with "Missing Configuration" items, which the system prevents. Currently, it is not very clear that this situation is why the system...
5 months ago in IBM Engineering - Foundation/Common Services / Global Configuration Management 3 Not under consideration

Unlock 'Aircraft' and 'Equipment or Aircraft' field in Work Order Tracking for unscheduled maintenance.

When manually generating a work order (within the Work Order Tracking app) the 'Aircraft' and 'Equipment or Aircraft' fields are read-only. This makes it difficult to create ad-hoc work orders for unscheduled maintenance. Currently these fields ar...
5 months ago in IBM MAS - Aviation 1 Is a defect

ETM REST API to list available fields for test artifacts

There should be a REST API to list available fields for each test artifact. Here is the customers description from a support case " I need an Rest API which gives me the list of fields available in any test artifact, i.e., test plan having title, ...
5 months ago in IBM Engineering - Test Management / Unassigned 1 Future consideration

Unique handling of links in filter 'Link changes' during delivery and comparison

This is related to TS016372244 and TS016488144. Feedback from IBM Development Team, and it is working as designed: "As we know, when a user creates an incoming link in Component A from Component B, that link is stored in Component B. In my tests, ...
5 months ago in IBM Engineering - Requirements Management DOORS Next / Usability 0 Future consideration

Changeset resolution on moving from offline to online

1. When we switch from offline to online mode there may be too many change sets and this becomes really confusing when deciding which changes to be taken. 2. Diff merge is not efficient in viewing the changes and resolving conflicts.
almost 2 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Rhapsody Client 9 Functionality already exists

Inspection Form Question Grouping - Delete should not remove Inspection Questions

When inspection questions need to be removed from Inspection Question Groups the only current option is to drag and drop the inspection question out of the group and then delete the group. In the situation where I want to remove a group which has ...
about 2 years ago in IBM MAS - Manage (Base) / Asset/Work Management 0 Planned for future release

VET Indicate areas that each of the coreapi PODs handles e.g. POD1 handles MAS Mobile / POD2 handles MIF

The core MAS project includes three "coreapi" pods. Research shows that the some transactions (e.g. MAS Mobile) are being handled by the same POD. we would like to see more information about how to identify which POD is likely to handle particular...
over 2 years ago in IBM MAS - Common Services 1 Not under consideration

Means to come back directly to project view with components

When I select a project, I arrive on page "My Project" where I can see all components of the selected project.Then, I select a component and I arrive on a dashboard of the project. From this page, there is no direct means to come back to the page ...
about 6 years ago in IBM Engineering - Requirements Management DOORS Next / Feature 4 Not under consideration

Flows that are placed on connectors cannot be selected in an IBD

Flows that are placed on connectors cannot be selected in an IBD. Only the connector can be selected.Even if you navigate manually to the flow, it is not possible to access the flow items.See attachment flow_items.png People would like to use the ...
over 1 year ago in IBM Engineering - Systems Design Rhapsody/RMM / Modeling and UI 1 Future consideration