Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...
PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....

All ideas

Showing 5758 of 5758

Stop auto-approving material, tools and services cost transactions

Currently, Maximo auto-approves a transaction when material, tools or services are entered. If a user makes a mistake when entering a cost, there's no way to fix the error before the transaction is approved. The only way to rectify this is to put ...
over 2 years ago in IBM MAS - Manage (Base) 1 Not under consideration

When both Monitor and Manage are used, give me an easier way to inherit dimensions from Manage for devices instead of manually defining dimensions and associating them.

In Maximo Manage, I specify information about assets such as Classification, Classification Attributes, Asset Type, etc. I should be able to use this information to inherit dimensions about the sensor device attached to an asset instead of manuall...
over 1 year ago in IBM MAS - APM 0 Future consideration

Allow devices that are attached to assets to be published as part of the Asset hierarchy from Maximo Manage to Maximo Monitor

Devices such as sensors are attached to assets. Many customers track these OT devices as assets within Maximo Manage. These devices are usually tracked as a child asset attached to a parent as a sub assembly. We should provide the option to publis...
over 1 year ago in IBM MAS - APM 0 Future consideration

Review Comment Filtering Improvements

The current requirement review interface is not great for responding to reviews. The following would be appreciated: 1) Add the ability to collapse different sections (for example, when responding to comments, it is not necessary to see a list of ...
almost 2 years ago in IBM Engineering - Requirements Management DOORS Next / Feature 1 Future consideration

Read only access to workflow

Hello Everyone, How to provided read only access to workflow development tools. We want to Hide the New, Revise, Retire and Delete options on the Builder Tool. From testing some scenarios we found that removing the Application Builder licenses fro...
about 4 years ago in IBM TRIRIGA Application Platform 2 Not under consideration

Duplicate Workorder - Better ability to control how Job Plan revisions are handled

Current functionality is inadequate. When you duplicate a WO the revision is carried over leading to old/inactive/no longer valid or complying with regulations to be carried over. See the IBM Case file for more information. I have a couple of thou...
6 months ago in IBM MAS - Manage (Base) / Asset/Work Management 0 Future consideration

Provide option in "Duplicate" feature to not add "Copy of" in front of artifacts copied to the target that have the same name as existing artifacts

We want to duplicate test suites to another project area, such that the test suite and none of the included artifacts are prefixed with "Copy of" when the name is not unique.We are spending a lot of time manually removing the prefix. Could you add...
6 months ago in IBM Engineering - Test Management / Usability 0 Future consideration

Create an Image Gallery in TRIRIGA

Hi, Some customers want Image Gallery, where they want to see all the images uploaded for Tasks, Inspections, Buildings etc. searchable by important tags. For example, instead of going to different sections inside TRIRIGA to look for Inspection re...
6 months ago in IBM TRIRIGA Cross Functional Application 1 Future consideration

Enable change sets in ETM to group changes as in DOORS

It would be very useful to replicate the DNG functionality of change sets in the ETM application in order to: - Allow the association of several changes and a unique deliver of them. - Associate the change set to a Change Request work item allocat...
almost 3 years ago in IBM Engineering - Test Management / Usability 0 Future consideration

Need possbility to link a Report with other ELM artifacts e.g. EWM Work Items

There shall be the possibility to link a report with an ELM Artifact. The report should be bi-directional. For EWM a related link or a resolves/resolved by!link is sufficient. Use-case: - link a development plan item e.g. Feature with the report w...
over 1 year ago in IBM Engineering - Reporting / Report Builder 1 Future consideration