Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...
PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....

All ideas

Showing 5819

CAD Publish and Attach Events are not Logged Historically in the Tririga DB

IBM Ticket - TS016365859 As established in the above ticket, the CAD_DRAWING table stores a row per floor with information like created_by, created_date, modified_by, and modified_date, and is updated any time a user attaches a floor plan in CAD I...
5 days ago in IBM TRIRIGA Space Management / Space Management 0 Submitted

MAS Manage - Automatic Authentication to Cognos Analytics

Nowadays is required the user to connect first into Cognos Analytics application, keep the Cognos Analytics tab opened to run any Cognos report from any application. The idea is to Cognos works the same as Maximo 7.6.1.x where there is no need to ...
13 days ago in IBM MAS - Manage (Base) / Reporting 1 Future consideration

Provide a comprehensive learning report to include further fields such as % completion across those users who are completing badges and courses relating to Envizi

We now have over 200 users who are accessing their technical training for IBM Envizi. This number will continue to grow, and the existing reporting as described in the additional details is quite limited providing a high level view of those users ...
26 days ago in IBM Envizi - ESG Suite / Base Platform 0 Submitted

Rational Directory Administrator: support the RDS web interface on the same platforms as the RDS itself

Commonly RDA gets installed on the same machine(s) as RDS. To have a discrepancy in supported OS is problematic.

Add support to restrict CSV/XLS Export from DNG Project Area

Currently there is no way to prevent making data export from DNG Project Area data. Permission sets are not able to restrict CSV/XLS Export, if user has READ acces This is data security issue. Please add this support.
7 days ago in IBM Engineering - Requirements Management DOORS Next / Unassigned 0 Future consideration

Add the ability to assign multiple labor records to an unplanned work order in a single click in Graphical Work Week

I have an unplanned work order and want to assign it to multiple labor record. In Assignment Manager, this can be done in 1 click. In GWW, you have to create new assignments. Functionality in GWW should work like it does in Assignment Manager.
13 days ago in IBM MAS - Scheduler 2 Planned for future release

European clients expects data input in esg framework to be multilanguage

Hi Felice, in our recent contacts with prospect clients, they have highlighted the importance to have an Italian official version of the 160 ESRS Framework questions and related data points. For all of them it would be a very significant feature r...
19 days ago in IBM Envizi - ESG Suite / ESG Reporting Frameworks 0 Submitted

Add ability to disable hover text that pops out when hovering over columns such as description in the upper left quadrant in Graphical Work Week

This hover text can slow down navigation and if the user doesn't want to see it, they should be able to disable it or perhaps add a navigation shortcut to purposely indicate they want to see the full text. A user drags the mouse over the screen fr...
12 days ago in IBM MAS - Scheduler 0 Planned for future release

Add the Filter Tag = "Consolidation" to the Sustainability (Executive Report) PowerReport (All Pages)

In the built-in Sustainability (Executive Report) PowerReport, there is no filter on Tag Types. Because of this, if there are additional tags associated with other tag types attached to included data, that data will be duplicated in measure calcul...
3 days ago in IBM Envizi - ESG Suite / Base Platform 0 Submitted

Visual graphical Trend line for inspection results

Often times in the field a person will be able to see or make important decisions rapidly if they can see a visual representation for results over a period of days (5,10,15) quickly. Replace previous results with a visual graph of data points.
3 days ago in IBM MAS - Mobile 0 Submitted