Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....

IBM MAS - Manage (Base)

Showing 953

SERVICEABILITY - Configure/ Disable PodMonitor via Manage application

PodMonitors are created by default in MAS. For Saas the configuration is by default and clients are not able to change the specs for example interval of monitoring Example: podMetricsEndpoints: - interval: 30s scheme: https targetPort: 9444 tlsCon...
4 months ago in IBM MAS - Manage (Base) / Integration 1 Under review

Enable inventory reservation automatic cron task for specific site

Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....
over 2 years ago in IBM MAS - Manage (Base) 3 Future consideration

ReportImport Cron Task Should Create CronTaskHistory Records

Maximo 7.6.1.2 changed the way new Reports are uploaded. Rather than check for Reports to be loaded every time a JVM starts up, Maximo 7.6.1.2 introduced a ReportImport Cron Task which is created in one of two ways: - By UpdateDB.- By executing th...
over 3 years ago in IBM MAS - Manage (Base) 2 Future consideration

Maximo Manage - Attachment and Log properties related to S3 should use credentials defined in ObjectStorageCfg at suite level or have consistency of S3 usage across Apps and adhere to use Secret instead of sensitive properties at CR level

How Maximo Visual Inspection uses ObjectStorageCfg Maximo Visual Inspection lets user defining bucket name and leaves the responsibility of defining access key, secret key, endpoint to ObjectStorageCfg objectStorageBucketNames: myWorkSpace: mvi-in...
4 months ago in IBM MAS - Manage (Base) / System Admin Config/Security 0 Future consideration

Allow Updating of Owner Field For Queries

Currently, the Owner field for a query can't be changed (I'm assuming due to it being part of the Primary Key Column Sequence along with clausename and app) but as users leave, that means the query can no longer be modified except via the database...
over 11 years ago in IBM MAS - Manage (Base) 4

Maximo Manage System Property to set the log level to be used during the startup of Maximo Manage

When there is an issue during application startup you cannot change the log level in order to determine the root cause. It should be possible to set the log level to be used during application startup. If the startup failed completely, you could s...
8 months ago in IBM MAS - Manage (Base) 0 Future consideration

Add ability to make partial lookup icon more visible like in 7612

Users do not see the icon in MAS and go to save the record and get an error. Due to the icon not 'standing out', they do not see the issue.
over 1 year ago in IBM MAS - Manage (Base) 0 Future consideration

Job Plan Material Costing Logic

When creating job plans, and planned materials are added, we've observed the following:1) If Direct Issue is left unchecked, and storeroom not filled in, the unit cost is zero2) If Storeroom if filled in, then unit cost is populated per the storer...
4 months ago in IBM MAS - Manage (Base) / Asset/Work Management 0 Future consideration

Align behaviour for Associated Assets within Warranty Contract

Align the fonctionalities for New Row, Select More Assets and Select Locations. If i use New Row i can see at the actual page that i enter my new asset or location. if i use Select More Assets an i'm not at the first page (asset 1-12 of 20, flip t...
4 months ago in IBM MAS - Manage (Base) / Asset/Work Management 1 Not under consideration

Tiered Price Purchase Contract

Add the ability in Purchase Contracts to have tiered pricing for the same item on contract lines. Move this functionality from Maximo for Aviation to core Maximo. This isn't industry specific functionality.
almost 4 years ago in IBM MAS - Manage (Base) / Supply Chain 0 Future consideration