Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...
PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....

All ideas

Showing 5698 of 5698

If a work log should not be added for a Service Request that is in history then it is expected that option of adding a work log to such Service Requests should be disabled or made read-only instead of allowing it first and then throwing a System Message.

In the Maximo (7.6.1.2) Service Requests Role-based application, in the "Completed Requests" page, when a work log is being added to an existing Service Request that is in Cancel or Closed status a system message is displayed with the message "Tic...
almost 2 years ago in IBM MAS - Manage (Base) 1 Not under consideration

Make ContextPattern pluginMethods more useful, flexible and effective

The syntax provided for specifying plug-in methods to extend ContextPatterns makes them hard to use. When specified, they replace both the "relation" and "token_name" fields in the context pattern, for example: *,{swm}Swimlane,{cts]pluginMethod:ge...
over 5 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Integrations and APIs 1 Future consideration

Create a expand keyword to control the versionId of additional document formats such as Word files

We know that there are expand keywords that can be used with the scm load command in order to print in the file the version provided by the source control tool when it is downloaded. However, the specific expand keyword $VersionId$ only works for ...
over 2 years ago in IBM Engineering - Workflow Management / Usability 4 Not under consideration

Comparing 2 changesets for the same element in the browser

In the Design Manager web browser, for one Rhapsody element changed several times, we can:- list and display the changesets using the "Explore Change Sets" option,- in front of the last changeset expanded, display the full history using the "Show ...
about 8 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Web Client 2 Future consideration

Request for adding the content column in the requirements links section of a test case

It will help all leads and test engineers to identify the correct requirements to link to their test cases.
almost 2 years ago in IBM Engineering - Requirements Management DOORS Next / Feature 0 Future consideration

Revision field to selct a scheduling week in work orders based on ISO 8601 week numbering

Many business operate and function by ISO 8601 week number. The ability to sort work orders by weekly revision is an easy way to envision a planning backlog, and also an easier way for work order and service request initiators to identify when wor...
11 months ago in IBM MAS - Manage (Base) 1 Not under consideration

Upgrade the unsupported Log4j v1.x files in the IBM Maximo Asset Management application to v2.17.1 or better.

The IBM Maximo Asset Management application uses the following Log4j v1.x files. Log4j v1.x has been deemed unsupported by Apache and these files are being tagged as vulnerable by code security scanners: \IBM\SMP\maximo\applications\maximo\lib\log...
over 2 years ago in IBM MAS - Manage (Base) 0 Future consideration

Delete multiple links

Feature to delete multiple links from a module will be a benefit for projects. In current situation you have the possibility to create easily links in DOORS Next (link by attribute key or create links via import functionality), but there is no opt...
over 2 years ago in IBM Engineering - Requirements Management DOORS Next / Usability 1 Future consideration

Adjust prices in Labor Price Books with % Adjustment

Please see the attached file.
over 5 years ago in IBM MAS - Service Provider 1 Future consideration

JRS-LQE report continues to show previous expected result content for Information Step

For a report on a test plan developed for our clients, we noticed an anomaly regarding data from an information step. On our environment, the information step stting is configured not to display "Expected Result" or related requirements. But, if t...
11 months ago in IBM Engineering - Test Management / Reporting 0 Future consideration