Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....
PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...

All ideas

Showing 5964

Ability to provide Start and End Measures for linear assets while entering meter readings

Ability to associate start and end measure on the enter meter readings options in the inspection forms.
about 1 year ago in IBM MAS - Manage (Base) 0 Future consideration

Bring in the route stop description (in case of linear feature label) in the inspection header description for asset.

It will be useful to provide the asset feature route stop description in case of linear assets features being used on the inspection form using routes. Currently there is no way to recognise the route stop / feature on which the inspection is bein...
about 1 year ago in IBM MAS - Manage (Base) 2 Not under consideration

Modification to Inventory Usage Application

ISSUE I have added 10 items to an Inventory Usage Record and have changed the status of the record to STAGED. It was determined that only 5 of the staged items are needed. It is not possible to delete a line from the inventory usage report.
over 10 years ago in IBM MAS - Manage (Base) 2 Not under consideration

Add Frost Index Alerting Tool

Airlines need to know if there is going to be a risk of frost up to 3 days out. If there is a risk than this alerting mechanism will allow them to prepare and ensure there is enough de-icing available. De-icing leads to delays and cancellations es...
over 2 years ago in Environmental Intelligence Suite: Add-ons / Aviation 2 Not under consideration

Calculated and display percent Work order completion in the Work Order Tracking application

In the Work Order Tracking application, Thales customer would like to display percent complete for work orders and tasks, and then calculate the percent complete for the parent work records and the schedule, helping planner to keep projects on track.
over 4 years ago in IBM MAS - Aviation 0 Future consideration

Enhancement of OSLC API: allow including attachments in test case results

Good evening, We have noticed that when we consult the information of a Test Case Result of “Scriptless Result” type, the xml generated using OSLC API and the xml generated using the Reportable REST API have different information. In order to alig...
about 1 year ago in IBM Engineering - Test Management / Integrations 0 Future consideration

Set Specific Time in Purges Run in addition to Frequency

Ability to run/control when purge is conducted (i.e. Weekly, on Sundays at 6 AM)
over 2 years ago in IBM MAS - Visual Inspection / MVI 2 Planned for future release

"Run Now" Button for Data Retention Policy

A button to exist within the data retention policy to run/execute the created policy.
over 2 years ago in IBM MAS - Visual Inspection / MVI 0 Future consideration

Be able to work on different versions of a stream without redoing a load

We need an improvement on EWM 6.0.6 for Eclipse. We have components in different version of a stream (see image Capture1.jpg). Sometimes we need to work on 2 versions at the same time (ex TSBD_6.0 and TSBD_DEV). We create 2 repository workspace. W...
over 2 years ago in IBM Engineering - Workflow Management / Source Control 3 Not under consideration

RQA - automated tests when entering a requirement

An automated test whilst entering the requirement shall be possible. This helps and ease the usage and workflow. Currently the check is processed on demand (so if the user actively starts the check). It is much more usable to visualize a check for...
over 3 years ago in IBM Engineering - Requirements Quality Assistant / Administration 1 Future consideration