Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...
PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....

All ideas

Showing 5966 of 5966

ReqIF to work in a GC world without (fine grained) component limitations

The tool shall support cross-component export package definition (in global context) as a kind of global ReqIF (or exchange) manager - maybe in several steps: Enhancement of today's DNG functionality to work cross-component (include outgoing links...
over 2 years ago in IBM Engineering - Requirements Management DOORS Next 2 Future consideration

When importing MAS Users in bulk (https://admin.*.suite.maximo.com/users), I want to be able to see the import feedback message (functionality already exists, but not all MAS Users can see it)

It seems some MAS users with the User Management level of access do see that feedback message, others do not. For those who don't, after the "Import" button is clicked, the UI takes you back to the user list screen without any sort of feedback on ...
over 1 year ago in IBM MAS - Common Services 3 Not under consideration

Need to be able to set Logger configuration back to default

In the Logger configuration we can change the logging level of each logger. After having done the debug, it would useful to reset all the changes back the default/original setting. Should have a button on the top to reset.
8 months ago in IBM Engineering - Requirements Management DOORS Next / Administration 0 Future consideration

For Long Cycle Work, reflect the Scheduled Start and End Date in Graphical Scheduling based on the Start and End Date of the Assignments, Don't Overwrite it

I have a long cycle construction work order, e.g. 40 hours of duration, that is marked as interruptible. Graphical Scheduling displays the bar correctly with the assumption that there are no breaks in when the work will be done, e.g if you start M...
2 months ago in IBM MAS - Scheduler 0 Planned for future release

Scheduler – Graphical Work Week - Remove the start date filled automatically.

The Scheduler has Work order's in his scope of work that does not have planning dates because it is not a priority. The scheduler wishes to identify them to populate his planning. The scheduler wishes that the schedule dates are not automatically ...
about 4 years ago in IBM MAS - Scheduler 6 Future consideration

Dashboard feature required

We have created a dashboard with master project area using scrum template, can this dashboard be inherited to the child project areas?
5 months ago in IBM Engineering - Requirements Management DOORS Next / Feature 1 Future consideration

BIM Integrator - Have the Populate Paramters work per FLOOR not the entire Model

Currently you cannot run the Populate Parameters on a single floor and that can be problamatic with multi-floor buildings, especailly with 8+ floors. We have seen issues and crashing realted to this for large multi-floor buildings.For example, I m...
over 1 year ago in IBM TRIRIGA Application Platform 2 Planned for future release

Provide the option to add an Asset to a WO using the map

The usecase is to select an Asset to add it to the workorder from the map. The Field engineer needs to be able to select the asset that he worked on (e.g. a gas pipe or electricity cable) to the Workorder. Or change it when the wrong asset was lin...
about 1 month ago in IBM MAS - Mobile 0 Future consideration

Partner Products Available in Suite Navigator

As an IBM Partner we develop our own products to complement MAS Manage, we would like these to be available in MAS Core / Suite Navigator.
about 1 month ago in IBM MAS - Common Services 0 Under review

Option to define the status for duplicated assets and moved assets

Currently the asset status is retained when you duplicate an asset. When you move an asset to a different site, the new asset has the same status as the original record. When you duplicate a decommissioned asset the status of the new asset is deco...
2 months ago in IBM MAS - Manage (Base) / Asset/Work Management 0 Future consideration