Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....
PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...

All ideas

Showing 5796

Export DOORS Baseline Comparison Results as Word Document

Currently the behavior in DOORS is as follows: Hello, 1 - Open a module.2 - Click File-->Baseline-->Compare...3 - left side: select a baseline; right side: select another baseline (or current)4 - Click Compare5 - Click OK in window where is ...
over 4 years ago in IBM Engineering - Requirements Management DOORS/DOORS Web Access / Baselines 1 Not under consideration

Document Update: destroy the reactive instance (delete should never be called directly)

Add "Call Destroy() method for destroying the reactive instance (delete should never be called directly)" to Code generation in Rhapsody documentation.This is already described at , but this is for C, not C++.
over 4 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Code and Execution 1 Future consideration

Easy way to mass add constraints between tasks

I have a milestone and I want to quickly draw a FS between the milestone and 5 other tasks. I don't want to have to draw this 5 separate times - I want a quick way to do it all at once.
about 3 years ago in IBM MAS - Scheduler 2 Future consideration

Edit imported view object's attribute datatype after saving -- but before db config

Scenario: Create an imported view object in db config. Save the object. We need to change a field type, but can't because the fields are read-only. It seems like it should be possible to edit saved object attribute datatypes -- before db config is...
about 3 years ago in IBM MAS - Manage (Base) / System Admin Config/Security 1 Future consideration

autoscript performance enhancement: provide method to check current logging level

The service object now sports log_debug() and log_info() methods. Maximo autoscripters are thankful for the option to choose the level we log messages at. The next step is to allow us to optimize performance by allowing us to choose when we try to...
about 3 years ago in IBM MAS - Manage (Base) / System Admin Config/Security 0 Future consideration

Allow administrators to enter free-form expressions in ad-hoc reports

Currently, there are limitations regarding ad-hoc report expressions: Expressions (SQL functions) are limited to the functions in the Expression Library (configurable). The fields that are available to expressions can only by number fields, not te...
about 3 years ago in IBM MAS - Manage (Base) / System Admin Config/Security 1 Not under consideration

variable assignments in autoscripts should logged at the TRACE level

I believe it is good practice for automation scripts to log approximately 1 message at the INFO level per execution -- just enough to give a support person a clue that the script is running and that it did something. In addition to that, a script ...
about 3 years ago in IBM MAS - Manage (Base) / System Admin Config/Security 4 Future consideration

The Global Binding Value for literal autoscript variables should allow nulls

For automation script variables of Binding Type LITERAL, the Binding Value needs to be permitted to be left blank / null. This will allow developers to make Variables optional and will not require them to craft garbage data, like "N/A", for their ...
about 3 years ago in IBM MAS - Manage (Base) 2 Future consideration

Reporting Attribute-based and Non-Attribute based presentation details from EWM into RPE Template

Reporting Attribute-based and Non-Attribute based presentation details from EWM into RPE Template
about 3 years ago in IBM Engineering - Workflow Management / Usability 8 Not under consideration

Control PM Work Order Generation Email Notifications for Administrative User

The Administrative user email address configured using the mxe.adminEmail email address currently receives all PM Work Order Generation email notifications regardless of whether the PM Options email address is configured per SITE or ORG. There sho...
almost 11 years ago in IBM MAS - Manage (Base) 3 Not under consideration