Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...
PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....

All ideas

Showing 5764

RFE-166302: UAT Finding: Test Plan reconciliation not able to handle testcase removal

The "reconcile" function via which "requirement" artifacts are used to trigger testcase artifact creation on ETM side and/or addition of testcases into ETM Test Plans is unable to efficiently deal with the situation that requirements "no longer" r...
about 2 years ago in IBM Engineering - Requirements Management DOORS Next / Usability 0 Future consideration

ELM702: Test Plan reconciliation not able to handle testcase removal

At the beginning requirements (in ERM) are set for a specific VnV Method (and VnV Method Sub). Based on this initial setting Test Plan(s) are created in ETM and testcase reconciliation is done. But then afterwards (e.g. due to further requiremen...
about 2 years ago in IBM Engineering - Requirements Management DOORS Next / Usability 0 Future consideration

Purge Based on Timestamp with Metadata

Ability to purge data based on given timestamp field found with metadata , within a specified time range.
about 2 years ago in IBM MAS - Visual Inspection / MVI 2 Planned for future release

In Graphical Scheduling and Graphical Work Week, on the Graphical View tab when the Work is filtered update the row count to reflect the count of the current filter rows

e.g., work list has 300 rows with no filters, filtering by crewworkgroup reduces and displays 15 of 300
about 2 years ago in IBM MAS - Scheduler 0 Future consideration

Better Mail Configuration structure

Dear Jazz Team, currently there it is really confusing for users to configure Mail settings for ETM. There are two different ways for configuring mail settings: 1) In the profile of the user there is a mail configuration [1 - ETM_profile] In add...
about 2 years ago in IBM Engineering - Test Management / Usability 0 Future consideration

DNG : Tag modification is not always reported in the Compare and Deliver dialogs

The goal of this RFE is to improve the behaviour below so that the users know in the Compare dialog in the GUI, what was modified, but are still the same in both streams To reproduce: -create a CM enabled project -create a Requirement -add a Pers...
about 2 years ago in IBM Engineering - Requirements Management DOORS Next / Usability 0 Future consideration

Add "Read Only" change management constraint to individual streams

It is not uncommon to have a single stream that represents the production state of a component design. Work on the system takes place in work streams that are branched from the production state and, after suitable review and approval, merged into ...
about 2 years ago in IBM Engineering - Requirements Management DOORS Next / Feature 0 Future consideration

Enhancement to Meter Based PMs

When job plan sequencing is used on Meter Based PMs AND there is a sudden spike in the reading Maximo does not adjust to pull the accurate JP but issues a work orders as per the job plan sequence. The JP Selection logic assumes that meter reading ...
almost 9 years ago in IBM MAS - Manage (Base) 1 Future consideration

Selective artifact merging feature in DNG

We have a platform project and several variant projects, which are derivations of the platform project. The projects use the same modules(SysReqSpecification, same module IDs) which include several artifacts (requirements). Each variant project re...
over 6 years ago in IBM Engineering - Requirements Management DOORS Next / Feature 2 Not under consideration

Make Identify tool dropdown layers in order from Map Service

When using the identify tool the drop down does not return the list in the expected order.This makes the tool confusing to the users, that expects to see a Set As Current button, but sometimes the tool picks by default another random record that i...
almost 9 years ago in IBM MAS - Spatial 1 Planned for future release