Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....
PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...

All ideas

Showing 5693 of 5693

add Properties view back in menu of component and baseline to see the UUID of artifact

Before v7.0.2 we were able to view "properties" of a component or a baseline in EWM to see the UUID. Why it has been deleted in 7.0.2? This is usefull for users in Eclipse client.
almost 2 years ago in IBM Engineering - Workflow Management / Source Control 3 Future consideration

Have an indicator that would highlight if an artifact has been modified since the last baseline

Have an attribute or an indicator that would highlight if an artifact, contained in a module, has been modified since the last baseline (this function already exists in DOORS 9.x and highlights the changes made in a module since the last baseline)
almost 4 years ago in IBM Engineering - Requirements Management DOORS Next / Feature 0 Not under consideration

DNG need Module's baseline

From DNG V6, module baselines were replaced with project baselines. Project level baseline make individual management difficult. Accessibility is very low and hard to grasp activities for particular artifacts, module and so on. You can trace using...
over 6 years ago in IBM Engineering - Requirements Management DOORS Next / Feature 3 Not under consideration

While generating Testcase execution records, Looking for option to select multiple attributes from same type to generate a single TCER

For Power Systems configurations we often have to test the integration of different devices in the same system at a time to verify they work together. Sometimes those devices are the same type, like two network adapters, and we need to be able to ...
over 1 year ago in IBM Engineering - Test Management / Test Execution 0 Future consideration

Full OSLC support in RQM API

Submitting at request of Christophe Telep and Chris Allen - this came out of the Test Management DPP. The IBM ask was what improvements should be made to the APIs? Here is my OSLC Java developer's response. Please see attached files for detailed c...
over 4 years ago in IBM Engineering - Test Management / Integrations 1 Not under consideration

An unique ID added to the RM review record

An unique ID added to the RM review record
over 6 years ago in IBM Engineering - Requirements Management DOORS Next / Feature 3 Not under consideration

Maximo join

In order to analyse the cron task instance (start/end time and JVM which ran the cron) that ran a scheduled report, a relationship is required between the REPORTUSAGELOG table and CRONTASKINSTANCE table. Although this info may be captured in Syste...
about 3 years ago in IBM MAS - Manage (Base) 2 Not under consideration

Block / Postpone the Scheduled User Reports During Meta Model Refresh

Use Case : For Enterprise ELM Instances, Meta Model Refresh runs ~4h. This leads to Meta Model Refresh failures and User Reports will have inconsistency because there were scheduled JRS Reports running at the same time as Meta Model Refresh Soluti...
8 months ago in IBM Engineering - Reporting / JRS 1 Future consideration

Capability to assign attribute's enumeration in N*N format

We would like to have the feature implemented for attributes in RTC work item in such a way that the enumeration list of one attribute can be mapped to enumeration list of another attribute.
about 3 years ago in IBM Engineering - Workflow Management / Work Items 1 Future consideration

Maximo Inspections forms - Signing off inspections as additional fields of forms

Add additional section of forms in order to comply with ones of the most important parts of an inspections " Signing off inspections" of the involved person (at least two person/user involved = responsable and supervisor).
about 3 years ago in IBM MAS - Manage (Base) 4 Planned for future release