Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....
PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...

All ideas

Showing 5819

Option to remove add-on and industry solution products from MAS

We would like to have an option to remove add-on and industry solutions from MAS. Security guidelines prescribe the removal of products not, or no longer, used. Currently there is no other option than manual removal (SQL-scripts, remove files, etc...
7 months ago in IBM MAS - Manage (Base) / System Admin Config/Security 3 Not under consideration

Enhancement request to have define formal gates on sequence diagrams

According to UML specification (2.5.1) interactions can have formal gates (Figure_17.1_UMLSpecification.png). They would allow messages from and to the diagram frame, see Figure_17.4_UmlSpecification.png and Figure_17.14_UmlSpecification.png. The ...
9 months ago in IBM Engineering - Systems Design Rhapsody/RMM / Rhapsody Client 3 Future consideration

Rethink the Self Service Center search engine to ensure the search engine just search among offering and ignore all incident, service request tickets

Here is something that causes some problems in the 7.6.1.3 version of Control desk and possibly since a longer time. Because outside of Control Desk application, the search engine of the Self Service Center currently fetches all incident, service ...
over 2 years ago in IBM MAS - Maximo IT 9 Not under consideration

Create work order or service request to Maximo Manage from a detected failure image, the actual version look like is not connected at all.

In the actual version of visual inspection, you only can create data sets and models, then use in mobile, but when you detected a failure you cannot create a work order to Manage Maximo or even a service request.
over 2 years ago in IBM MAS - Visual Inspection / MVI 4 Planned for future release

Flag to Identify that a Purchase Requisition (PR) was Generated by Reorder

System: 7.6.1 Description: Currently Maximo is configured to be able to run the reorder automatically via cron task or to run the reorder manually. When those are generated, the only thing that identifies that the PR was generated by reorder is vi...
about 5 years ago in IBM MAS - Manage (Base) / Supply Chain 2 Planned for future release

Enable custom text on MAS Manage Start Center screen as Welcome message

Customer would like text on the MAS Manage Start Center screen to specify for the user, which environment they are in. They have 5 environments that are not named in a self-explanatory way, and we can't change the names of them. The ability to con...
over 2 years ago in IBM MAS - Manage (Base) / System Admin Config/Security 1 Functionality already exists

Change report scheduling date dialogue box to allow for annual report scheduling

The date schedule dialogue box for report scheduling in all applications is less detailed than in other places in Maximo (escalations, cron task instances), and does not allow for annually scheduled reports, such as run on May 15th every year.
over 3 years ago in IBM MAS - Manage (Base) 1 Future consideration

Animation window can not be resized

Please make the animation instance window resizable.
almost 4 years ago in IBM Engineering - Systems Design Rhapsody/RMM / Modeling and UI 0 Future consideration

SAML - TRIRIGA OSLC API's

When using the TRIRIGA OSLC capability to post data into TRIRIGA or pull data out using API endpoints, we are needing the ability to hit the endpoints without using basic authentication via a service account. Ideally, we would use OKTA Oauth authe...
over 1 year ago in IBM TRIRIGA Application Platform 1 Future consideration

Keep link to return in the Drilldown after consulting Item Master

Actually, first level of item is shown in the Drilldown. If user click on item, it is possible to "Go To Item Master" with the link at bottom of Drilldown. After this, the user can not return back in the item master with a shortcut in the top left...
12 months ago in IBM MAS - Manage (Base) 3 Not under consideration