Skip to Main Content
IBM Sustainability Software - Ideas Portal


This portal is to open public enhancement requests against the products and services belonging to IBM Sustainability Software. To view all of your ideas submitted to IBM, create and manage groups of Ideas, or create an idea explicitly set to be either visible by all (public) or visible only to you and IBM (private), use the IBM Unified Ideas Portal (https://ideas.ibm.com).


Shape the future of IBM!

We invite you to shape the future of IBM, including product roadmaps, by submitting ideas that matter to you the most. Here's how it works:

Search existing ideas

Start by searching and reviewing ideas and requests to enhance a product or service. Take a look at ideas others have posted, and add a comment, vote, or subscribe to updates on them if they matter to you. If you can't find what you are looking for,

Post your ideas
  1. Post an idea.

  2. Get feedback from the IBM team and other customers to refine your idea.

  3. Follow the idea through the IBM Ideas process.


Specific links you will want to bookmark for future use

Welcome to the IBM Ideas Portal (https://www.ibm.com/ideas) - Use this site to find out additional information and details about the IBM Ideas process and statuses.

IBM Unified Ideas Portal (https://ideas.ibm.com) - Use this site to view all of your ideas, create new ideas for any IBM product, or search for ideas across all of IBM.

ideasibm@us.ibm.com - Use this email to suggest enhancements to the Ideas process or request help from IBM for submitting your Ideas.

ADD A NEW IDEA

Pinned ideas

PINNED Enable inventory reservation automatic cron task for specific site
Advantage : Enable the cron for specific site which is necessary. Summary: In Maximo, we have more than 50 Active sites. When we try to enable inventory reservation automatic cron task for specific site, There is no Cron Parameters are available....
PINNED Power BI capability alignment between Desktop vs embedded solution
Requesting Customer: Fraser Property but this would benefit all customers using Envizi Power BI capability Business Impact: The Frasers Property Team have recently explored the use of the embeded PowerBI functionality and have found that there are...

All ideas

Showing 5326 of 5326

Scheduler – Graphical Work Week - Remove the start date filled automatically.

The Scheduler has Work order's in his scope of work that does not have planning dates because it is not a priority. The scheduler wishes to identify them to populate his planning. The scheduler wishes that the schedule dates are not automatically ...
over 3 years ago in IBM MAS - Scheduler 6 Future consideration

Add geolocation to the attachments

We have option to inform the latitude and longitude to locations, assets and work orders. The idea is to enable the geolocation when we take a picture using Maximo Mobile
about 1 year ago in IBM MAS - Mobile 2 Not under consideration

Navigate between workorders without back to list

The ideia is to develop some way to navigate between workorder records click on a sign to move to next workorder in the sequence or swiping between each other inside the record.
over 1 year ago in IBM MAS - Mobile 0 Future consideration

DNG to detect and avoid creating links to same artifacts

Hello team, Currently, whenever we perform a merge or a delivery of artifacts, the tool doesn't detect if there are any links already present in the artifact and instead considers the link as new each time, thus adding the link again. So, every ti...
about 1 month ago in IBM Engineering - Requirements Management DOORS Next / Feature 0 Future consideration

Highlight or flag when a primary text is bigger than 32KB, to avoid issues when export to Microsoft excel format.

When user try to export a view of a module, that contains text bigger than 32KB, in excel format the tool gives the error: ID CRRRW8021E The content of primary text field must be less than 32 KB, in order to be exported. Edit the content of primar...
3 months ago in IBM Engineering - Requirements Management DOORS/DOORS Web Access / Export 0 Future consideration

Almost all customers I met in 2 years asked to me to watch their own bill accounts in the Utility Bill module from Capturis or other. providers (or a sample from another customer even my own home account)

The customers do not want to know HOW we ingest data from Capturis or others, but they only would like to see their bill accounts (or a sample one) in the demo.
4 months ago in IBM Envizi - ESG Suite / Utility Bill Analytics 4 Not under consideration

Tririga function to apply prorated index adjustment

When an index adjustment occurs between 2 payments (example, two payments - in avance - occur 01/01/2023 and 04/01/2023, and adjustment date is 03/01/2023), we would like to have the option to apply the adjustment to the period between adjustment ...
8 months ago in IBM TRIRIGA Real Estate & Lease Accounting Management 2 Future consideration

DOORS Next Change Set REST API needed

Need to report on the history of the requirements.The DOORS Next API allows to see all the details with the history=true parameter. The issue is that this history can grow exponentially and be very time consuming to parse.Also we want to filter ba...
8 months ago in IBM Engineering - Requirements Management DOORS Next / Integrations 0 Future consideration

Queue SMTP Emails when SMTP Server is Unavailable

There are various scenarios in Maximo where email is sent explicitly from the various MXServer.sendEmail() methods. For example, the PM WOGEN cron task. If the email fails to send to the SMTP server (such as the SMTP server is down) it's gone fore...
over 3 years ago in IBM MAS - Manage (Base) 2 Planned for future release

Require e-Signature on Completing Inspection from RBA/WorkCentre/Mobile

Problem Statement: When a technician is performing an inspection and completing it, they are able to confirm the inspection without an e-Signature. Business Impact : When Maximo is used by a clients in the Life Sciences domain, the data is strictl...
about 1 month ago in IBM MAS - Manage (Base) / Asset/Work Management 0 Under review